Install EV Chargers in Saint Louis, Missouri

Install EV chargers or analyze a site in Saint Louis, Missouri. 13 existing public charging locations (4 DC fast, 9 Level 2). Free 0–100 profitability score on any Saint Louis address from EV Data Map by Charge Rigs.

Saint Louis, Missouri is served by 13 public electric vehicle charging locations operating 36 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Saint Louis is Blink Network with 6 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 238 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Saint Louis and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Saint Louis

Saint Louis, Missouri offers a balanced EV charging landscape with 13 public locations, including 4 DC fast chargers that average an impressive 238 kW, positioning the city as a strong contender in fast-charging capabilities. The significant presence of 75% of DC fast stations classified as 150 kW or higher ensures that drivers have access to ultra-fast charging options, crucial for minimizing downtime. With Blink Network operating nearly half of the charging sites, the market maintains a diverse yet stable ecosystem, fostering competition among operators like ChargePoint and eVgo. This combination of high-power options and a mix of charging types caters to varying driver needs while highlighting opportunities for improvement within the city's overall charging infrastructure.

Saint Louis charging by the numbers

Locations
13
Chargers
36
DC Fast locations
4
Level 2 locations
9

DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 2.8. Average DC fast power: 238 kW.

Saint Louis charging — local snapshot

Top operator share
Blink Network runs 46% of public locations across 3 networks.
Average DC fast power
238 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 13 locations
Estimated DC ports
11 fast-charging ports city-wide

Charging networks in Saint Louis

The following operators run public charging in Saint Louis, ranked by number of locations.

Featured charging locations in Saint Louis

A selection of higher-power public charging locations across Saint Louis, sorted by power level.

  1. Southfield Center — Saint Louis, MO, 63123 (eVgo Network · DC Fast · 350 kW)
  2. South Lakeview Plaza — Saint Louis, MO, 63129 (eVgo Network · DC Fast · 350 kW)
  3. SOUTH CO DCJR EXPP-59AA2 — Saint Louis, MO, 63125 (ChargePoint Network · DC Fast · 200 kW)
  4. Commerce Bank - Tower Grove — Saint Louis, MO, 63118 (eVgo Network · DC Fast · 50 kW)
  5. SOUTH CO DCJR CP6000-EAST — Saint Louis, MO, 63125 (ChargePoint Network · Level 2 · 19.2 kW)
  6. SOUTH CO DCJR CP6000-MID — Saint Louis, MO, 63125 (ChargePoint Network · Level 2 · 19.2 kW)
  7. The View at Forest Park Apartments — Saint Louis, MO, 63108 (Blink Network · Level 2 · 13.1 kW)
  8. SOUTH CO DCJR CP6000-WEST — Saint Louis, MO, 63125 (ChargePoint Network · Level 2 · 9.6 kW)
  9. Maryville University - North Lot — Saint Louis, MO, 63141 (Blink Network · Level 2 · 8.6 kW)
  10. Expo at Forrest Park (South Building) — Saint Louis, MO, 63112 (Blink Network · Level 2 · 8.6 kW)
  11. Expo at Forrest Park (North Building) — Saint Louis, MO, 63112 (Blink Network · Level 2 · 8.6 kW)
  12. Maryville University - South Lot — Saint Louis, MO, 63141 (Blink Network · Level 2 · 8.6 kW)

Nearby cities with EV charging coverage

Other cities in Missouri we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Saint Louis specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Saint Louis, Missouri?
There are 13 public electric vehicle charging locations in Saint Louis, Missouri, with a combined 36 individual chargers. 4 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Saint Louis?
Blink Network operates the most public charging locations in Saint Louis with 6 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Saint Louis?
Level 2 EV chargers in Saint Louis typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Saint Louis?
Most Saint Louis projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Missouri state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Saint Louis?
A typical commercial Level 2 installation in Saint Louis energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Saint Louis take to become profitable?
Payback in Saint Louis depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.