Install EV chargers or score a site in New Hampshire with EV Data Map by Charge Rigs. 304 existing public charging locations (80 DC fast, 223 Level 2). Free 0–100 profitability analysis on any New Hampshire address.
New Hampshire is served by 304 public electric vehicle charging locations operating 808 individual chargers. 80 of those locations (26%) provide DC fast charging suitable for road-trip stops, while 223 (73%) deliver Level 2 charging for longer-dwell parking such as workplaces, retail and hospitality.
The cities with the most public charging in New Hampshire are Manchester (33), Portsmouth (22), Salem (16), Lebanon (15), Nashua (14). Across the state, charging is provided by a mix of national networks and regional operators.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI — combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer to enter any address in New Hampshire and receive an instant score, demand projection and recommended charger configuration.
DC fast share: 26% · Level 2 share: 73% · 74 cities with public charging.
The strongest EV charging hubs in New Hampshire — explore site analysis and coverage detail:
The following New Hampshire cities have the most public EV charging locations.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand inputs include the registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For New Hampshire the model accounts for the existing footprint of 80 DC fast and 223 Level 2 sites distributed across 74 cities, plus interstate corridor traffic and state-specific incentive programs such as NEVI awards.