Install EV Chargers in Montvale, New Jersey

Install EV chargers or analyze a site in Montvale, New Jersey. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Montvale address from EV Data Map by Charge Rigs.

Montvale, New Jersey is served by 11 public electric vehicle charging locations operating 52 individual chargers — an average of 4.7 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Montvale is ChargePoint Network with 6 locations, followed by SWTCH with 1. Average DC fast power across the city is approximately 290 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Montvale and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Montvale

Montvale stands out in the EV charging landscape with a competitive mix of charging options, featuring 11 public locations operated by six distinct networks, led by ChargePoint Network at 55% market share. This variety fosters a dynamic environment where drivers can select charging stations based on power and amenities rather than sticking to a single brand. With two DC fast charging stations averaging an impressive 290 kW and capable of reaching up to 400 kW, the city boasts ultra-fast options that cater to high-demand drivers. Moreover, 100% of DC fast sites are classified as 150 kW or higher, positioning Montvale favorably for both current EV users and potential growth in electric vehicle adoption.

Montvale charging by the numbers

Locations
11
Chargers
52
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 4.7. Average DC fast power: 290 kW.

Montvale charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 6 networks.
Average DC fast power
290 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Montvale

The following operators run public charging in Montvale, ranked by number of locations.

Featured charging locations in Montvale

A selection of higher-power public charging locations across Montvale, sorted by power level.

  1. James Gandolfini Service Area — Montvale, NJ, 07645 (APPLEGREEN · DC Fast · 400 kW)
  2. Montvale PD — Montvale, NJ, 07645 (VIALYNK · DC Fast · 180 kW)
  3. QFS - 180 Summit — Montvale, NJ, 07645 (SWTCH · Level 2 · 11.5 kW)
  4. 50 Chestnut Ridge — Montvale, NJ, 07645 (EVOKE · Level 2 · 11.5 kW)
  5. 155 Chestnut Ridge — Montvale, NJ, 07645 (EVGATEWAY · Level 2 · 11.5 kW)
  6. MONTVALE MB II STATION 2 — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MONTVALE MB II STATION 1 — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MDA II PHILLIPS STATION 2 — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MONTVALE DEV WEGMANS — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MDA II PHILLIPS STATION 4 — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MDA II PHILLIPS STATION 1 — Montvale, NJ, 07645 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Montvale specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Montvale, New Jersey?
There are 11 public electric vehicle charging locations in Montvale, New Jersey, with a combined 52 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Montvale?
ChargePoint Network operates the most public charging locations in Montvale with 6 sites, followed by SWTCH with 1 sites.
How much does it cost to install an EV charger in Montvale?
Level 2 EV chargers in Montvale typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Montvale?
Most Montvale projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Montvale?
A typical commercial Level 2 installation in Montvale energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Montvale take to become profitable?
Payback in Montvale depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage