Install EV Chargers in Paramus, New Jersey

Install EV chargers or analyze a site in Paramus, New Jersey. 39 existing public charging locations (14 DC fast, 25 Level 2). Free 0–100 profitability score on any Paramus address from EV Data Map by Charge Rigs.

Paramus, New Jersey is served by 39 public electric vehicle charging locations operating 156 individual chargers — an average of 4.0 chargers per site. Of those locations, 14 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Paramus is ChargePoint Network with 26 locations, followed by Tesla with 4. Average DC fast power across the city is approximately 230 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Paramus and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Paramus

In Paramus, New Jersey, the EV charging landscape is primarily led by ChargePoint Network, which accounts for 67% of the city's 39 public charging locations. This concentration offers potential developers critical insight into the reliability and pricing control tied to a single operator. With 14 DC fast charging stations averaging 230 kW, and most boasting power capabilities of 150 kW or higher, Paramus presents a competitive advantage for new entrants equipped with 150–350 kW hardware, enhancing their appeal to drivers seeking ultra-fast charging options. Furthermore, the combination of Level 2 and DC fast chargers ensures a comprehensive approach to meet varying driver needs, inviting opportunities to strategically position additional stations in a region with underserved access.

Paramus charging by the numbers

Locations
39
Chargers
156
DC Fast locations
14
Level 2 locations
25

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 4.0. Average DC fast power: 230 kW.

Paramus charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 8 networks.
Average DC fast power
230 kW (fastest stall: 350 kW)
High-power share
79% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 39 locations
Estimated DC ports
86 fast-charging ports city-wide

Charging networks in Paramus

The following operators run public charging in Paramus, ranked by number of locations.

Featured charging locations in Paramus

A selection of higher-power public charging locations across Paramus, sorted by power level.

  1. Wakefern Shoprite 160 (Paramus, NJ) — Paramus, NJ, 07652 (Electrify America · DC Fast · 350 kW)
  2. Westfield Garden State Plaza (Paramus, NJ) — Paramus, NJ, 06611 (Electrify America · DC Fast · 350 kW)
  3. Bergen Town Center - Tesla Supercharger — Paramus, NJ, 07652 (Tesla · DC Fast · 325 kW)
  4. Paramus, NJ — Paramus, NJ, 07652 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  5. 633 RT17 AAF TRK DC RT — Paramus, NJ, 07652 (ChargePoint Network · DC Fast · 250 kW)
  6. 633 RT17 AAF TRK DC LEFT — Paramus, NJ, 07652 (ChargePoint Network · DC Fast · 250 kW)
  7. Raymour & Flanigan - Tesla Supercharger — Paramus, NJ, 07652 (Tesla · DC Fast · 250 kW)
  8. Paramus, NJ - 501 NJ-17 - Tesla Supercharger — Paramus, NJ, 07652 (Tesla · DC Fast · 250 kW)
  9. Dunkin' Donuts - Tesla Supercharger — Paramus, NJ, 07652 (Tesla · DC Fast · 250 kW)
  10. 375 RT17 PARAMUS DC LT — Paramus, NJ, 07652 (ChargePoint Network · DC Fast · 250 kW)
  11. 375 RT17 PARAMUS DC RT — Paramus, NJ, 07652 (ChargePoint Network · DC Fast · 250 kW)
  12. CLASS 3 CHARGER HYUNDAI- 1 — Paramus, NJ, 07652 (ChargePoint Network · DC Fast · 62.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Paramus specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Paramus, New Jersey?
There are 39 public electric vehicle charging locations in Paramus, New Jersey, with a combined 156 individual chargers. 14 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Paramus?
ChargePoint Network operates the most public charging locations in Paramus with 26 sites, followed by Tesla with 4 sites.
How much does it cost to install an EV charger in Paramus?
Level 2 EV chargers in Paramus typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Paramus?
Most Paramus projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Paramus?
A typical commercial Level 2 installation in Paramus energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Paramus take to become profitable?
Payback in Paramus depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.