Install EV chargers or analyze a site in West Orange, New Jersey. 15 existing public charging locations (6 DC fast, 8 Level 2). Free 0–100 profitability score on any West Orange address from EV Data Map by Charge Rigs.
West Orange, New Jersey is served by 15 public electric vehicle charging locations operating 40 individual chargers — an average of 2.7 chargers per site. Of those locations, 6 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (53%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in West Orange is ChargePoint Network with 7 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 106 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in West Orange and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in West Orange
West Orange boasts a vibrant EV charging ecosystem featuring 15 public locations managed by six distinct operators, with ChargePoint Network holding a significant 47% market share. This diversity fosters competitive pricing and service availability, allowing drivers to choose based on power levels and amenities rather than sticking to a single network. The six DC fast chargers, averaging 106 kW and peaking at 350 kW, offer solid options for quick top-ups, with 17% of these sites rated at 150 kW or higher. As the market evolves, new entrants offering 150–350 kW hardware can tap into this growing landscape, enhancing overall charging convenience and efficiency for EV users in the area.
West Orange charging by the numbers
Locations
15
Chargers
40
DC Fast locations
6
Level 2 locations
8
DC fast share: 40% of locations. Level 2 share: 53%. Average chargers per site: 2.7. Average DC fast power: 106 kW.
West Orange charging — local snapshot
Top operator share
ChargePoint Network runs 47% of public locations across 6 networks.
Average DC fast power
106 kW (fastest stall: 350 kW)
High-power share
17% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 15 locations
Estimated DC ports
10 fast-charging ports city-wide
Charging networks in West Orange
The following operators run public charging in West Orange, ranked by number of locations.
ChargePoint Network — 7 locations
Blink Network — 3 locations
Tesla Destination — 2 locations
Non-Networked — 1 location
eVgo Network — 1 location
EV Connect — 1 location
Featured charging locations in West Orange
A selection of higher-power public charging locations across West Orange, sorted by power level.
Courtyard by Marriott West Orange — West Orange, NJ, 07052 (eVgo Network · DC Fast · 350 kW)
ESSEX COUNTY ZOO DC 1 SUPER — West Orange, NJ, 07052 (ChargePoint Network · DC Fast · 62.5 kW)
ESSEX COUNTY ZOO DC 3 — West Orange, NJ, 07052 (ChargePoint Network · DC Fast · 62.5 kW)
ESSEX COUNTY ZOO DC 4 — West Orange, NJ, 07052 (ChargePoint Network · DC Fast · 62.5 kW)
ESSEX COUNTY ZOO DC 2 SECOND — West Orange, NJ, 07052 (ChargePoint Network · DC Fast · 50 kW)
Dunkin Donuts - West Orange — West Orange, NJ, 7052 (Blink Network · DC Fast · 50 kW)
The West — West Orange, NJ, 07052 (Blink Network · Level 2 · 10.8 kW)
West Orange Dog Park - Tesla Destination — West Orange, NJ, 07052 (Tesla Destination · Level 2 · 7.2 kW)
Highlawn Pavilion - Tesla Destination — West Orange, NJ, 07052 (Tesla Destination · Level 2 · 7.2 kW)
South Mountain Recreational Complex — West Orange, NJ, 07052 (EV Connect · Level 2 · 7.2 kW)
EDISON LOFTS STATION 2 — West Orange, NJ, 07052 (ChargePoint Network · Level 2 · 6.5 kW)
ESSEX COUNTY OFF NETWORK3 — West Orange, NJ, 07052 (ChargePoint Network · Level 2 · 6.5 kW)
Nearby cities with EV charging coverage
Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For West Orange specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in West Orange, New Jersey?
There are 15 public electric vehicle charging locations in West Orange, New Jersey, with a combined 40 individual chargers. 6 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in West Orange?
ChargePoint Network operates the most public charging locations in West Orange with 7 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in West Orange?
Level 2 EV chargers in West Orange typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in West Orange?
Most West Orange projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in West Orange?
A typical commercial Level 2 installation in West Orange energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in West Orange take to become profitable?
Payback in West Orange depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.