Install EV Chargers in Livingston, New Jersey

Install EV chargers or analyze a site in Livingston, New Jersey. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Livingston address from EV Data Map by Charge Rigs.

Livingston, New Jersey is served by 13 public electric vehicle charging locations operating 38 individual chargers — an average of 2.9 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Livingston is ChargePoint Network with 9 locations, followed by OpConnect with 1. Average DC fast power across the city is approximately 56 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Livingston and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Livingston

Livingston, New Jersey, presents a distinctive landscape for EV charging, predominantly shaped by the ChargePoint Network, which operates nearly 70% of the city's 13 public charging locations. With most facilities providing Level 2 charging, the two available DC fast chargers, averaging 56 kW, reflect an older infrastructure—particularly noteworthy given that none meet the higher 150 kW threshold. This creates an opportunity for new operators to introduce faster charging options, appealing to drivers who rely on efficiency for longer trips. The relatively low proportion of fast chargers (15%) integrated with a robust Level 2 network suggests that Livingston is primed for expansion in high-speed charging capabilities, making it an ideal market for savvy developers looking to meet driver demand.

Livingston charging by the numbers

Locations
13
Chargers
38
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 2.9. Average DC fast power: 56 kW.

Livingston charging — local snapshot

Top operator share
ChargePoint Network runs 69% of public locations across 5 networks.
Average DC fast power
56 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
3 fast-charging ports city-wide

Charging networks in Livingston

The following operators run public charging in Livingston, ranked by number of locations.

Featured charging locations in Livingston

A selection of higher-power public charging locations across Livingston, sorted by power level.

  1. ESSEX COUNTY RIKER HILL DC1 — Livingston, NJ, 07039 (ChargePoint Network · DC Fast · 62.5 kW)
  2. Livingston Mall — Livingston, NJ, 07039 (eVgo Network · DC Fast · 50 kW)
  3. Continental Properties-Highgate @Livingston — Livingston, NJ, 07039 (OpConnect · Level 2 · 7.7 kW)
  4. Livingston Town Hall — Livingston, NJ, 07039 (EV Connect · Level 2 · 7.2 kW)
  5. EASTMAN MGT5 TOWER 1 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  6. LIVINGSTON ECC STATION 1 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  7. EASTMAN MGT5 TOWER 2 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  8. EASTMAN MGMT PLAZA 2-TOWER 1 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  9. EASTMAN MGMT PLAZA 2-TOWER 2 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LIVINGSTON ECC STATION 2 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)
  11. ParkVue at Livingston — Livingston, NJ, 07039 (Blink Network · Level 2 · 6.5 kW)
  12. EASTMAN MGMT PLAZA 1-TOWER 2 — Livingston, NJ, 07039 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Livingston specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Livingston, New Jersey?
There are 13 public electric vehicle charging locations in Livingston, New Jersey, with a combined 38 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Livingston?
ChargePoint Network operates the most public charging locations in Livingston with 9 sites, followed by OpConnect with 1 sites.
How much does it cost to install an EV charger in Livingston?
Level 2 EV chargers in Livingston typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Livingston?
Most Livingston projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Livingston?
A typical commercial Level 2 installation in Livingston energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Livingston take to become profitable?
Payback in Livingston depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.