Install EV Chargers in Maplewood, New Jersey

Install EV chargers or analyze a site in Maplewood, New Jersey. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Maplewood address from EV Data Map by Charge Rigs.

Maplewood, New Jersey is served by 13 public electric vehicle charging locations operating 33 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Maplewood is ChargePoint Network with 6 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 38 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Maplewood and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Maplewood

Maplewood, New Jersey offers a balanced mix of charging options with 13 public locations, where 15% are DC fast chargers powered predominantly by older technology, averaging 38 kW and peaking at 60 kW. This infrastructure presents a unique landscape for developers, as it reflects a transitional stage where demand for advanced 150 kW-class offerings is unmet, driving potential for future investment. The presence of four distinct charging networks, led by ChargePoint with nearly half of the sites, further indicates competitive opportunities for operators. With the surrounding demographics and traffic patterns in mind, the city’s charging setup reveals significant openings for enhanced fast charging solutions to address evolving driver needs.

Maplewood charging by the numbers

Locations
13
Chargers
33
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 2.5. Average DC fast power: 38 kW.

Maplewood charging — local snapshot

Top operator share
ChargePoint Network runs 46% of public locations across 4 networks.
Average DC fast power
38 kW (fastest stall: 60 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
7 fast-charging ports city-wide

Charging networks in Maplewood

The following operators run public charging in Maplewood, ranked by number of locations.

Featured charging locations in Maplewood

A selection of higher-power public charging locations across Maplewood, sorted by power level.

  1. Maplewood Township (Department of Public Works) — Maplewood, NJ, 07040 (NOODOE · DC Fast · 60 kW)
  2. The Gleason — Maplewood, NJ, 07040 (Blink Network · DC Fast · 16.6 kW)
  3. 747 Valley — Maplewood, NJ, 07040 (Blink Network · Level 2 · 13 kW)
  4. Springfield and Indiana Lot — Maplewood, NJ, 07040 (Blink Network · Level 2 · 8.6 kW)
  5. Maplewood Middle School — Maplewood, NJ, 07040 (Blink Network · Level 2 · 8.6 kW)
  6. TWPMAPLEWOOD MEMORIAL LIBR — Maplewood, NJ, 07040 (ChargePoint Network · Level 2 · 7.7 kW)
  7. Powers Electric Parking — Maplewood, NJ, 07040 (FLO · Level 2 · 7.2 kW)
  8. Hilton Branch Public Library — Maplewood, NJ, 07040 (Blink Network · Level 2 · 6.8 kW)
  9. SPRINGPOINT STATION ONELEFT — Maplewood, NJ, 07040 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TWPMAPLEWOOD WOODLAND60 — Maplewood, NJ, 07040 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MPCA MPCA ST1 — Maplewood, NJ, 07040 (ChargePoint Network · Level 2 · 6.5 kW)
  12. SPRINGPOINT STATIONRIGHT — Maplewood, NJ, 07040 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Maplewood specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Maplewood, New Jersey?
There are 13 public electric vehicle charging locations in Maplewood, New Jersey, with a combined 33 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Maplewood?
ChargePoint Network operates the most public charging locations in Maplewood with 6 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in Maplewood?
Level 2 EV chargers in Maplewood typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Maplewood?
Most Maplewood projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Maplewood?
A typical commercial Level 2 installation in Maplewood energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Maplewood take to become profitable?
Payback in Maplewood depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.