Install EV chargers or analyze a site in Maplewood, New Jersey. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Maplewood address from EV Data Map by Charge Rigs.
Maplewood, New Jersey is served by 13 public electric vehicle charging locations operating 33 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Maplewood is ChargePoint Network with 6 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 38 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Maplewood and receive an instant ROI score, demand projection, and recommended charger configuration.
In Maplewood, New Jersey, the EV charging landscape features 13 public locations, with 15% classified as DC fast charging stations, providing a solid but somewhat dated power curve with an average output of 38 kW. The fastest station boasts a 60 kW capacity, indicating a reliance on older technology rather than the emerging 150 kW-class chargers that could redefine user experiences. The presence of four distinct charging networks, primarily dominated by ChargePoint Network, offers a balanced market for drivers, ensuring some competition without a dominant monopoly. This unique mix creates an opportunity for site developers to strategically enhance charging options to meet evolving demand, addressing gaps in charging speed and availability in a community eager for modern infrastructure.
DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 2.5. Average DC fast power: 38 kW.
The following operators run public charging in Maplewood, ranked by number of locations.
A selection of higher-power public charging locations across Maplewood, sorted by power level.
Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Maplewood specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.