Install EV chargers or analyze a site in Geneseo, New York. 16 existing public charging locations (1 DC fast, 15 Level 2). Free 0–100 profitability score on any Geneseo address from EV Data Map by Charge Rigs.
Geneseo, New York is served by 16 public electric vehicle charging locations operating 40 individual chargers — an average of 2.5 chargers per site. Of those locations, 1 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Geneseo is ChargePoint Network with 14 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Geneseo and receive an instant ROI score, demand projection, and recommended charger configuration.
Geneseo, New York, features a charging landscape predominantly managed by ChargePoint Network, which accounts for 88% of the 16 public charging locations, ensuring consistent uptime and reliability. The city hosts a noteworthy DC fast charger that averages 151 kW, placing Geneseo on the cutting edge of current charging capabilities, with 100% of those fast sites rated at 150 kW or above. This concentrated presence allows new entrants with chargers in the 150–350 kW range to directly compete in serve-demand for power, offering opportunities for enhanced visibility in driver navigation apps. Additionally, the balance of 15 Level 2 chargers caters to longer-stay needs, highlighting potential for strategic expansions amidst surrounding cities like Livonia and Rochester.
DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.5. Average DC fast power: 151 kW.
The following operators run public charging in Geneseo, ranked by number of locations.
A selection of higher-power public charging locations across Geneseo, sorted by power level.
Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Geneseo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.