Install EV Chargers in Livonia, New York

Install EV chargers or analyze a site in Livonia, New York. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any Livonia address from EV Data Map by Charge Rigs.

Livonia, New York is served by 10 public electric vehicle charging locations operating 20 individual chargers — an average of 2.0 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Livonia is ChargePoint Network with 9 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Livonia and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Livonia

In Livonia, New York, the public charging landscape is entirely dominated by Level 2 stations, with no DC fast charging options available, which means EV drivers seeking quick top-ups must leave the city. ChargePoint Network operates 90% of the 10 public charging sites, leaving substantial responsibility for uptime and pricing resting on a single provider. This concentration underscores the potential for new operators to introduce DC fast charging solutions, tapping into a largely unmet demand among local residents and visitors. As Livonia's EV infrastructure remains underdeveloped, innovative developers can leverage EV Data Map insights to strategically identify and address the gaps in charging availability, meeting the needs of a growing EV market.

Livonia charging by the numbers

Locations
10
Chargers
20
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.0. Average DC fast power: 0 kW.

Livonia charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in Livonia

The following operators run public charging in Livonia, ranked by number of locations.

Featured charging locations in Livonia

A selection of higher-power public charging locations across Livonia, sorted by power level.

  1. Prettejohn Public Parking Lot — Livonia, NY, 14487 (Non-Networked · Level 2 · 7.2 kW)
  2. LIVONIA CSD ES 1 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  3. LIVONIA CSD MHS 2 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  4. LIVONIA CSD ES 2 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  5. LIVONIA CSD CONNELL 1 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  6. LIVONIA CSD ES 3 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  7. LIVONIA CSD MHS 1 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  8. LIVONIA CSD MHS 3 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  9. LIVONIA CSD CONNELL 2 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LIVONIA CSD CONNELL 3 — Livonia, NY, 14487 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Livonia specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Livonia, New York?
There are 10 public electric vehicle charging locations in Livonia, New York, with a combined 20 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Livonia?
ChargePoint Network operates the most public charging locations in Livonia with 9 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Livonia?
Level 2 EV chargers in Livonia typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Livonia?
Most Livonia projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Livonia?
A typical commercial Level 2 installation in Livonia energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Livonia take to become profitable?
Payback in Livonia depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage