Install EV Chargers in Medford, New York

Install EV chargers or analyze a site in Medford, New York. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Medford address from EV Data Map by Charge Rigs.

Medford, New York is served by 11 public electric vehicle charging locations operating 26 individual chargers — an average of 2.4 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Medford is ChargePoint Network with 8 locations, followed by Electrify America with 1. Average DC fast power across the city is approximately 158 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Medford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Medford

In Medford, New York, EV charging is significantly influenced by ChargePoint Network, which controls 73% of the city's 11 public charging locations, offering a reliable experience for users. With 27% of these locations devoted to DC fast charging and an average power output of 158 kW—peaking at 350 kW—drivers can benefit from rapid charging options. Notably, one-third of DC fast sites exceed 150 kW, making high-powered charging a competitive advantage. The current mix of 3 DC fast chargers alongside 8 Level 2 stations caters to varying user needs, but new site developers should consider the existing concentration and power capabilities to carve out their niche in the market.

Medford charging by the numbers

Locations
11
Chargers
26
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.4. Average DC fast power: 158 kW.

Medford charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 4 networks.
Average DC fast power
158 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Medford

The following operators run public charging in Medford, ranked by number of locations.

Featured charging locations in Medford

A selection of higher-power public charging locations across Medford, sorted by power level.

  1. Sam's Club 6428 (Medford, NY) — Medford, NY, 11933 (Electrify America · DC Fast · 350 kW)
  2. 112 H FST CGR REAR — Medford, NY, 11763 (ChargePoint Network · DC Fast · 62.5 kW)
  3. 112 H FST CGR FRONT — Medford, NY, 11763 (ChargePoint Network · DC Fast · 62.5 kW)
  4. 3135 Route 112 Plaza — Medford, NY, 11763 (AMPUP · Level 2 · 7.2 kW)
  5. Medford Suffolk Federal Credit Union - Parking — Medford, NY, 11763 (EVOKE · Level 2 · 7 kW)
  6. GREYBARN MEDFORD #1 — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)
  7. GREYBARN MEDFORD #5 — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)
  8. GREYBARN MEDFORD #6 — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)
  9. RECHLER MEDFORD #4 — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BROWNS RAM TRUCK — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)
  11. RECHLER MEDFORD #2 — Medford, NY, 11763 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Medford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Medford, New York?
There are 11 public electric vehicle charging locations in Medford, New York, with a combined 26 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Medford?
ChargePoint Network operates the most public charging locations in Medford with 8 sites, followed by Electrify America with 1 sites.
How much does it cost to install an EV charger in Medford?
Level 2 EV chargers in Medford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Medford?
Most Medford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Medford?
A typical commercial Level 2 installation in Medford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Medford take to become profitable?
Payback in Medford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage