Install EV chargers or analyze a site in Morrisville, North Carolina. 49 existing public charging locations (1 DC fast, 48 Level 2). Free 0–100 profitability score on any Morrisville address from EV Data Map by Charge Rigs.
Morrisville, North Carolina is served by 49 public electric vehicle charging locations operating 154 individual chargers — an average of 3.1 chargers per site. Of those locations, 1 (2%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 48 (98%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Morrisville is ChargePoint Network with 34 locations, followed by LOOP with 8. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Morrisville and receive an instant ROI score, demand projection, and recommended charger configuration.
Morrisville, North Carolina's public EV charging landscape is heavily influenced by ChargePoint Network, which operates 69% of the city’s 49 charging locations, emphasizing the importance of network reliability and availability for potential new site developers. The presence of only one DC fast charging station, offering ultra-fast 250 kW power, highlights a significant gap in rapid charging options; with 100% of DC fast sites categorized as 150 kW-class or higher, there is an opportunity for competing operators to introduce faster infrastructure. Additionally, the remaining public stations predominantly provide Level 2 charging, reflecting longer-term parking habits. Understanding these dynamics can be key for identifying optimal locations that address both current demand and future growth in Morrisville and neighboring areas.
DC fast share: 2% of locations. Level 2 share: 98%. Average chargers per site: 3.1. Average DC fast power: 250 kW.
The following operators run public charging in Morrisville, ranked by number of locations.
A selection of higher-power public charging locations across Morrisville, sorted by power level.
Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Morrisville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 48 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.