Install EV Chargers in Morrisville, North Carolina

Install EV chargers or analyze a site in Morrisville, North Carolina. 49 existing public charging locations (1 DC fast, 48 Level 2). Free 0–100 profitability score on any Morrisville address from EV Data Map by Charge Rigs.

Morrisville, North Carolina is served by 49 public electric vehicle charging locations operating 154 individual chargers — an average of 3.1 chargers per site. Of those locations, 1 (2%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 48 (98%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Morrisville is ChargePoint Network with 34 locations, followed by LOOP with 8. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Morrisville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Morrisville

Morrisville, North Carolina, presents a unique landscape for EV charging, heavily influenced by the strong presence of ChargePoint Network, which manages 69% of the city's 49 public locations. The single DC fast charging station, offering an impressive 250 kW, represents only 2% of the total charging sites but highlights a significant opportunity for new operators focusing on ultra-fast charging solutions of 150 kW or higher. With a mix of 48 Level 2 chargers primarily catering to longer dwell times, the city’s charging infrastructure creates a clear distinction in user experience. Developers considering Morrisville need to recognize the high-performance benchmarks already set and the demand for more robust DC fast options to attract drivers in an increasingly competitive regional market.

Morrisville charging by the numbers

Locations
49
Chargers
154
DC Fast locations
1
Level 2 locations
48

DC fast share: 2% of locations. Level 2 share: 98%. Average chargers per site: 3.1. Average DC fast power: 250 kW.

Morrisville charging — local snapshot

Top operator share
ChargePoint Network runs 69% of public locations across 5 networks.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
2% DC fast / 98% Level 2 across 49 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Morrisville

The following operators run public charging in Morrisville, ranked by number of locations.

Featured charging locations in Morrisville

A selection of higher-power public charging locations across Morrisville, sorted by power level.

  1. Sheetz - Tesla Supercharger — Morrisville, NC, 27560 (Tesla · DC Fast · 250 kW)
  2. DISTRICT SQUARE STATION 2 — Morrisville, NC, 27560 (ChargePoint Network · Level 2 · 11.5 kW)
  3. DISTRICT SQUARE STATION 3 — Morrisville, NC, 27560 (ChargePoint Network · Level 2 · 11.5 kW)
  4. Align Technology Inc. — Morrisville, NC, 27560 (Blink Network · Level 2 · 10.8 kW)
  5. CBRE @ Microsoft station location — Morrisville, NC, 27560 (Blink Network · Level 2 · 10.4 kW)
  6. Residences at Shiloh Crossing Manager — Morrisville, NC, 27560 (Blink Network · Level 2 · 10.4 kW)
  7. Southport Business Park Building 4 — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)
  8. Southport Business Park Building 14 — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)
  9. 215 Southport Drive — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)
  10. 951 Aviation Parkway — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)
  11. 160 Pharma Dr Building 15 — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)
  12. Southport Business Park Building 6 — Morrisville, NC, 27560 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Morrisville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 48 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Morrisville, North Carolina?
There are 49 public electric vehicle charging locations in Morrisville, North Carolina, with a combined 154 individual chargers. 1 locations offer DC fast charging and 48 provide Level 2 charging.
What is the largest EV charging network in Morrisville?
ChargePoint Network operates the most public charging locations in Morrisville with 34 sites, followed by LOOP with 8 sites.
How much does it cost to install an EV charger in Morrisville?
Level 2 EV chargers in Morrisville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Morrisville?
Most Morrisville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Morrisville?
A typical commercial Level 2 installation in Morrisville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Morrisville take to become profitable?
Payback in Morrisville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage