Install EV Chargers in Pinehurst, North Carolina

Install EV chargers or analyze a site in Pinehurst, North Carolina. 13 existing public charging locations (0 DC fast, 13 Level 2). Free 0–100 profitability score on any Pinehurst address from EV Data Map by Charge Rigs.

Pinehurst, North Carolina is served by 13 public electric vehicle charging locations operating 28 individual chargers — an average of 2.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pinehurst is ChargePoint Network with 9 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pinehurst and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pinehurst

Pinehurst, North Carolina, presents a unique landscape for EV charging infrastructure, where all 13 public charging stations are Level 2, with no DC fast chargers available. This lack of fast-charging options means that local EV drivers seeking a speedy recharge must venture outside the city, indicating a significant opportunity for new developments aiming to capture that unmet demand. With ChargePoint Network managing nearly 70% of these sites, any potential competitor must consider the implications of network reliability and pricing that come with such a concentration. Given this distinctive charging profile, addressing the need for fast-charging solutions could not only enhance the local EV ecosystem but also attract visitors who require quick charging solutions as they travel through the region.

Pinehurst charging by the numbers

Locations
13
Chargers
28
DC Fast locations
0
Level 2 locations
13

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.2. Average DC fast power: 0 kW.

Pinehurst charging — local snapshot

Top operator share
ChargePoint Network runs 69% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 13 locations

Charging networks in Pinehurst

The following operators run public charging in Pinehurst, ranked by number of locations.

Featured charging locations in Pinehurst

A selection of higher-power public charging locations across Pinehurst, sorted by power level.

  1. Craddock Cottage - Tesla Destination — Pinehurst, NC, 28374 (Tesla Destination · Level 2 · 7.2 kW)
  2. Pinehurst Resort Parking Lot — Pinehurst, NC, 28374 (Non-Networked · Level 2 · 7.2 kW)
  3. Cypress Cottage - Tesla Destination — Pinehurst, NC, 28374 (Tesla Destination · Level 2 · 7.2 kW)
  4. Pinehurst Resort - Tesla Destination — Pinehurst, NC, 28374 (Tesla Destination · Level 2 · 7.2 kW)
  5. PHR STATION E5CA9 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  6. PHR STATION 19806 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  7. PHR STATION E5D03 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  8. PHR STATION E5CFD — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  9. PHR STATION 197D1 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FOUNDATION HALL FOUNDATION HALL — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  11. PHR STATION 19915 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)
  12. PHR STATION E4C60 — Pinehurst, NC, 28374 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pinehurst specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pinehurst, North Carolina?
There are 13 public electric vehicle charging locations in Pinehurst, North Carolina, with a combined 28 individual chargers. 0 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Pinehurst?
ChargePoint Network operates the most public charging locations in Pinehurst with 9 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in Pinehurst?
Level 2 EV chargers in Pinehurst typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pinehurst?
Most Pinehurst projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pinehurst?
A typical commercial Level 2 installation in Pinehurst energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pinehurst take to become profitable?
Payback in Pinehurst depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.