Install EV Chargers in Pittsboro, North Carolina

Install EV chargers or analyze a site in Pittsboro, North Carolina. 13 existing public charging locations (0 DC fast, 13 Level 2). Free 0–100 profitability score on any Pittsboro address from EV Data Map by Charge Rigs.

Pittsboro, North Carolina is served by 13 public electric vehicle charging locations operating 41 individual chargers — an average of 3.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pittsboro is Blink Network with 8 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pittsboro and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pittsboro

Pittsboro, North Carolina, presents a unique landscape for EV charging, with all 13 public locations currently designated as Level 2, signaling a clear gap in DC fast charging options. The dominance of Blink Network, which operates 62% of these sites, places significant reliance on a single operator, influencing factors like uptime and pricing for potential site developers. With no DC fast chargers available, local EV drivers are left seeking rapid charging solutions outside the city, underscoring a ripe opportunity for new installations. Understanding the existing infrastructure and surrounding market dynamics could guide operators to fill this vital need for quick top-ups, particularly as traffic and demographic data highlight strategic placement possibilities.

Pittsboro charging by the numbers

Locations
13
Chargers
41
DC Fast locations
0
Level 2 locations
13

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 3.2. Average DC fast power: 0 kW.

Pittsboro charging — local snapshot

Top operator share
Blink Network runs 62% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 13 locations

Charging networks in Pittsboro

The following operators run public charging in Pittsboro, ranked by number of locations.

Featured charging locations in Pittsboro

A selection of higher-power public charging locations across Pittsboro, sorted by power level.

  1. Sanctuary at Powell Place Apartments Location 1 — Pittsboro, NC, 27312 (Blink Network · Level 2 · 19.8 kW)
  2. Sanctuary at Powell Place Apartments Location 2 — Pittsboro, NC, 27312 (Blink Network · Level 2 · 17.3 kW)
  3. Sanctuary at Powell Place Apartments Location 2 — Pittsboro, NC, 27312 (Blink Network · Level 2 · 16 kW)
  4. Sanctuary at Powell Place Apartments Location 1 — Pittsboro, NC, 27312 (Blink Network · Level 2 · 15.9 kW)
  5. Mosaic at Chatham Park - Building O — Pittsboro, NC, 27312 (Blink Network · Level 2 · 10.8 kW)
  6. MOSAIC at Chatham Park — Pittsboro, NC, 27312 (Blink Network · Level 2 · 8.6 kW)
  7. Mosaic at Chatham Park - Building W & Building U — Pittsboro, NC, 27312 (Blink Network · Level 2 · 8.6 kW)
  8. Paddles — Pittsboro, NC, 27312 (Blink Network · Level 2 · 8.6 kW)
  9. Cafe Root Cellar — Pittsboro, NC, 27312 (Non-Networked · Level 2 · 7.2 kW)
  10. POL STATION PITTSBORO 1 — Pittsboro, NC, 27312 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CHATHAM CO PERFORMANCE BLD — Pittsboro, NC, 27312 (ChargePoint Network · Level 2 · 6.5 kW)
  12. POL STATION TOWN HALL — Pittsboro, NC, 27312 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pittsboro specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pittsboro, North Carolina?
There are 13 public electric vehicle charging locations in Pittsboro, North Carolina, with a combined 41 individual chargers. 0 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Pittsboro?
Blink Network operates the most public charging locations in Pittsboro with 8 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Pittsboro?
Level 2 EV chargers in Pittsboro typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pittsboro?
Most Pittsboro projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pittsboro?
A typical commercial Level 2 installation in Pittsboro energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pittsboro take to become profitable?
Payback in Pittsboro depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.