Install EV chargers or analyze a site in Grove City, Ohio. 14 existing public charging locations (2 DC fast, 12 Level 2). Free 0–100 profitability score on any Grove City address from EV Data Map by Charge Rigs.
Grove City, Ohio is served by 14 public electric vehicle charging locations operating 35 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Grove City is ChargePoint Network with 8 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 135 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Grove City and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Grove City
Grove City boasts a competitive public charging landscape, featuring 14 locations with a diverse mix of operators, including ChargePoint Network, which dominates with 57% of the sites. This variety fosters a dynamic environment where drivers can choose stations based on power and amenity, rather than being tied to a single brand. Notably, 14% of these locations provide DC fast charging, with an average output of 135 kW and 50% offering 150 kW-class or higher, making them well-suited for speedy top-ups. With approximately 10 DC fast ports throughout the city, Grove City’s infrastructure caters effectively to both short and long dwell needs, ensuring a nuanced approach to EV charging for local users and visitors alike.
Grove City charging by the numbers
Locations
14
Chargers
35
DC Fast locations
2
Level 2 locations
12
DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 2.5. Average DC fast power: 135 kW.
Grove City charging — local snapshot
Top operator share
ChargePoint Network runs 57% of public locations across 6 networks.
Average DC fast power
135 kW (fastest stall: 150 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 14 locations
Estimated DC ports
10 fast-charging ports city-wide
Charging networks in Grove City
The following operators run public charging in Grove City, ranked by number of locations.
ChargePoint Network — 8 locations
Blink Network — 2 locations
Tesla Destination — 1 location
Tesla — 1 location
Non-Networked — 1 location
EV Connect — 1 location
Featured charging locations in Grove City
A selection of higher-power public charging locations across Grove City, sorted by power level.
Derby Square Shopping Center - Tesla Supercharger — Grove City, OH, 43123 (Tesla · DC Fast · 150 kW)
Byers Chevrolet — Grove City, OH, 43123 (EV Connect · DC Fast · 120 kW)
Brookfield Village Apartments — Grove City, OH, 43123 (Blink Network · Level 2 · 12 kW)
Browns Farm — Grove City, OH, 43123 (Blink Network · Level 2 · 10 kW)
Best Western Executive Inn - Tesla Destination — Grove City, OH, 43123 (Tesla Destination · Level 2 · 7.2 kW)
City of Grove City - Public Parking — Grove City, OH, 43123 (Non-Networked · Level 2 · 7.2 kW)
COTA G.C. P&R UNIT 2 — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
COTA G.C. P&R UNIT 1 — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
COTA G.C. P&R UNIT 3 — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
INDUS HOTEL TRU — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
BROADWAYSTATION BROADWAY 2 — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
BROADWAYSTATION BROADWAY 1 — Grove City, OH, 43123 (ChargePoint Network · Level 2 · 6.5 kW)
Nearby cities with EV charging coverage
Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Grove City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Grove City, Ohio?
There are 14 public electric vehicle charging locations in Grove City, Ohio, with a combined 35 individual chargers. 2 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Grove City?
ChargePoint Network operates the most public charging locations in Grove City with 8 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Grove City?
Level 2 EV chargers in Grove City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Grove City?
Most Grove City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Grove City?
A typical commercial Level 2 installation in Grove City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Grove City take to become profitable?
Payback in Grove City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.