Install EV Chargers in Powell, Ohio

Install EV chargers or analyze a site in Powell, Ohio. 10 existing public charging locations (3 DC fast, 7 Level 2). Free 0–100 profitability score on any Powell address from EV Data Map by Charge Rigs.

Powell, Ohio is served by 10 public electric vehicle charging locations operating 28 individual chargers — an average of 2.8 chargers per site. Of those locations, 3 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Powell is ChargePoint Network with 6 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 58 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Powell and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Powell

In Powell, Ohio, the EV charging landscape is predominantly shaped by ChargePoint Network, which operates 60% of the city's 10 public charging locations. This concentration underlines both the reliability and potential challenges for future site developers, as a single operator's performance influences overall access and pricing. With only three DC fast charging stations averaging 58 kW and the fastest at 63 kW, the local offerings represent an older generation of technology. This scenario creates opportunities for new entrants to captivate drivers seeking faster charging options, especially as nearby cities feature more advanced setups. The mix of 30% fast chargers and the remainder Level 2 stations caters to diverse driver needs, presenting a strategic advantage for developers aiming to enhance the charging network.

Powell charging by the numbers

Locations
10
Chargers
28
DC Fast locations
3
Level 2 locations
7

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 2.8. Average DC fast power: 58 kW.

Powell charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 4 networks.
Average DC fast power
58 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 10 locations
Estimated DC ports
3 fast-charging ports city-wide

Charging networks in Powell

The following operators run public charging in Powell, ranked by number of locations.

Featured charging locations in Powell

A selection of higher-power public charging locations across Powell, sorted by power level.

  1. MURPHY PARK DC #1 — Powell, OH, 43065 (ChargePoint Network · DC Fast · 62.5 kW)
  2. MURPHY PARK DC #2 — Powell, OH, 43065 (ChargePoint Network · DC Fast · 62.5 kW)
  3. KINSALE EV KINSALE EV — Powell, OH, 43065 (ChargePoint Network · DC Fast · 50 kW)
  4. Columbus Zoo and Aquarium — Powell, OH, 43065 (Blink Network · Level 2 · 11.5 kW)
  5. The Residences at Sara Crossing — Powell, OH, 43065 (Blink Network · Level 2 · 10.4 kW)
  6. Nolan Reserve — Powell, OH, 43065 (LOOP · Level 2 · 7.7 kW)
  7. City of Powell - Tesla Destination — Powell, OH, 43065 (Tesla Destination · Level 2 · 7.2 kW)
  8. MURPHY PARK CITY HALL — Powell, OH, 43065 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CHAMPION POWELL CROSSING — Powell, OH, 43065 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HUNTINGTON HOME RD — Powell, OH, 43065 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Powell specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Powell, Ohio?
There are 10 public electric vehicle charging locations in Powell, Ohio, with a combined 28 individual chargers. 3 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Powell?
ChargePoint Network operates the most public charging locations in Powell with 6 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Powell?
Level 2 EV chargers in Powell typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Powell?
Most Powell projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Powell?
A typical commercial Level 2 installation in Powell energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Powell take to become profitable?
Payback in Powell depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.