Install EV Chargers in Marysville, Ohio

Install EV chargers or analyze a site in Marysville, Ohio. 28 existing public charging locations (3 DC fast, 25 Level 2). Free 0–100 profitability score on any Marysville address from EV Data Map by Charge Rigs.

Marysville, Ohio is served by 28 public electric vehicle charging locations operating 65 individual chargers — an average of 2.3 chargers per site. Of those locations, 3 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Marysville is ChargePoint Network with 24 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 52 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Marysville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Marysville

Marysville, Ohio presents a unique landscape for EV charging, with ChargePoint Network providing a substantial 86% of its 28 public charging locations, thereby creating a reliance on a single operator for uptime and pricing consistency. While the three DC fast chargers average 52 kW, which is below the latest industry standards, competitors offering 150 kW or higher could attract drivers seeking faster options. With only 11% of charging locations classified as fast, the city primarily caters to longer dwell-time Level 2 needs. This distinct mix of slow and fast charging, along with the existing operator concentration, creates opportunities for strategic site development that can better meet evolving driver expectations.

Marysville charging by the numbers

Locations
28
Chargers
65
DC Fast locations
3
Level 2 locations
25

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.3. Average DC fast power: 52 kW.

Marysville charging — local snapshot

Top operator share
ChargePoint Network runs 86% of public locations across 3 networks.
Average DC fast power
52 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 28 locations
Estimated DC ports
3 fast-charging ports city-wide

Charging networks in Marysville

The following operators run public charging in Marysville, ranked by number of locations.

Featured charging locations in Marysville

A selection of higher-power public charging locations across Marysville, sorted by power level.

  1. GPM INVESTMENTS 5712 DC2 — Marysville, OH, 43040 (ChargePoint Network · DC Fast · 62.5 kW)
  2. GPM INVESTMENTS 5712 DC1 — Marysville, OH, 43040 (ChargePoint Network · DC Fast · 62 kW)
  3. Applied Electric, LLC - Honda Marysville — Marysville, OH, 43040 (Blink Network · DC Fast · 30 kW)
  4. MEMORIAL HEALTH CSN-01804240 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 13.4 kW)
  5. 255 at Union Station Apartments — Marysville, OH, 43040 (Blink Network · Level 2 · 10 kW)
  6. Woodside — Marysville, OH, 43040 (Blink Network · Level 2 · 8.6 kW)
  7. EVPassport - Home2 Suites — Marysville, OH, 43040 (Non-Networked · Level 2 · 7 kW)
  8. MARYSVILLE DUBLIN JEROME 2 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MARYSVILLECITY CITY HL PRK LT1 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MARYSVILLEFLATS STATION 1 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MARYSVILLEFLATS STATION 4 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MARYSVILLEFLATS 2- CT4020 — Marysville, OH, 43040 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Marysville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Marysville, Ohio?
There are 28 public electric vehicle charging locations in Marysville, Ohio, with a combined 65 individual chargers. 3 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Marysville?
ChargePoint Network operates the most public charging locations in Marysville with 24 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Marysville?
Level 2 EV chargers in Marysville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Marysville?
Most Marysville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Marysville?
A typical commercial Level 2 installation in Marysville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Marysville take to become profitable?
Payback in Marysville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.