Install EV chargers or analyze a site in Marysville, Ohio. 28 existing public charging locations (3 DC fast, 25 Level 2). Free 0–100 profitability score on any Marysville address from EV Data Map by Charge Rigs.
Marysville, Ohio is served by 28 public electric vehicle charging locations operating 65 individual chargers — an average of 2.3 chargers per site. Of those locations, 3 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Marysville is ChargePoint Network with 24 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 52 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Marysville and receive an instant ROI score, demand projection, and recommended charger configuration.
Marysville, Ohio presents a unique landscape for EV charging, with ChargePoint Network providing a substantial 86% of its 28 public charging locations, thereby creating a reliance on a single operator for uptime and pricing consistency. While the three DC fast chargers average 52 kW, which is below the latest industry standards, competitors offering 150 kW or higher could attract drivers seeking faster options. With only 11% of charging locations classified as fast, the city primarily caters to longer dwell-time Level 2 needs. This distinct mix of slow and fast charging, along with the existing operator concentration, creates opportunities for strategic site development that can better meet evolving driver expectations.
DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.3. Average DC fast power: 52 kW.
The following operators run public charging in Marysville, ranked by number of locations.
A selection of higher-power public charging locations across Marysville, sorted by power level.
Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Marysville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.