Install EV Chargers in Hood River, Oregon

Install EV chargers or analyze a site in Hood River, Oregon. 19 existing public charging locations (4 DC fast, 15 Level 2). Free 0–100 profitability score on any Hood River address from EV Data Map by Charge Rigs.

Hood River, Oregon is served by 19 public electric vehicle charging locations operating 62 individual chargers — an average of 3.3 chargers per site. Of those locations, 4 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Hood River is ChargePoint Network with 4 locations, followed by ZEFNET with 3. Average DC fast power across the city is approximately 256 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Hood River and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Hood River

Hood River uniquely stands out in its public EV charging landscape, featuring a blend of 19 charging locations managed by 10 distinct operators, the most prominent being ChargePoint Network. The city’s offering includes four DC fast charging sites, each equipped with an impressive average power output of 256 kW, ensuring rapid charging capabilities that cater to a range of driving needs. With all DC fast sites rated at 150 kW or more, Hood River boasts one of the fastest charging infrastructures available. This competitive environment encourages users to consider power levels and amenities when selecting charging locations, ultimately fostering a strategic approach to EV charging across the city.

Hood River charging by the numbers

Locations
19
Chargers
62
DC Fast locations
4
Level 2 locations
15

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.3. Average DC fast power: 256 kW.

Hood River charging — local snapshot

Top operator share
ChargePoint Network runs 21% of public locations across 10 networks.
Average DC fast power
256 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 19 locations
Estimated DC ports
32 fast-charging ports city-wide

Charging networks in Hood River

The following operators run public charging in Hood River, ranked by number of locations.

Featured charging locations in Hood River

A selection of higher-power public charging locations across Hood River, sorted by power level.

  1. Walmart 1876 (Hood River, OR) — Hood River, OR, 97031 (Electrify America · DC Fast · 350 kW)
  2. Hood River Waterfront - Tesla Supercharger — Hood River, OR, 97031 (Tesla · DC Fast · 250 kW)
  3. Cascade Commons - Tesla Supercharger — Hood River, OR, 97031 (Tesla · DC Fast · 250 kW)
  4. WCEH Hood River — Hood River, OR, 97031 (EVCS · DC Fast · 175 kW)
  5. Mt. Hood Winery — Hood River, OR, 97031 (ZEFNET · Level 2 · 11.9 kW)
  6. The Fruit Company — Hood River, OR, 97031 (ZEFNET · Level 2 · 11.9 kW)
  7. Gorge White House — Hood River, OR, 97031 (ZEFNET · Level 2 · 11.8 kW)
  8. Hood River Fire Department — Hood River, OR, 97031 (OpConnect · Level 2 · 9.6 kW)
  9. Waterfront at N 1st St — Hood River, OR, 97031 (OpConnect · Level 2 · 9.6 kW)
  10. Providence - Hood River Memorial Hospital — Hood River, OR, 97031 (Blink Network · Level 2 · 8.6 kW)
  11. Columbia Parking Lot - Hood River Oregon — Hood River, OR, 97031 (OpConnect · Level 2 · 7.7 kW)
  12. Stave & Stone Winery — Hood River, OR, 97031 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Hood River specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Hood River, Oregon?
There are 19 public electric vehicle charging locations in Hood River, Oregon, with a combined 62 individual chargers. 4 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Hood River?
ChargePoint Network operates the most public charging locations in Hood River with 4 sites, followed by ZEFNET with 3 sites.
How much does it cost to install an EV charger in Hood River?
Level 2 EV chargers in Hood River typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Hood River?
Most Hood River projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Hood River?
A typical commercial Level 2 installation in Hood River energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Hood River take to become profitable?
Payback in Hood River depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.