Install EV chargers or analyze a site in Lake Oswego, Oregon. 38 existing public charging locations (4 DC fast, 34 Level 2). Free 0–100 profitability score on any Lake Oswego address from EV Data Map by Charge Rigs.
Lake Oswego, Oregon is served by 38 public electric vehicle charging locations operating 104 individual chargers — an average of 2.7 chargers per site. Of those locations, 4 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 34 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Lake Oswego is ChargePoint Network with 19 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake Oswego and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Lake Oswego
Lake Oswego boasts a competitive EV charging landscape with 38 public locations backed by 7 distinct operators, ensuring diverse options for drivers. ChargePoint Network dominates with half of the sites, enabling a competitive pricing environment and enhancing uptime. The city offers an impressive average DC fast charging power of 250 kW, and all four DC fast stations exceed 150 kW, making this an attractive destination for quick recharges. With advanced rapid charging capabilities, including a peak of 350 kW, drivers in Lake Oswego can readily identify high-powered options that suit their needs, while the extensive Level 2 network caters to longer stays. This strategic mix positions Lake Oswego as an emerging hub for EV infrastructure in the region.
Lake Oswego charging by the numbers
Locations
38
Chargers
104
DC Fast locations
4
Level 2 locations
34
DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.7. Average DC fast power: 250 kW.
Lake Oswego charging — local snapshot
Top operator share
ChargePoint Network runs 50% of public locations across 7 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 38 locations
Estimated DC ports
10 fast-charging ports city-wide
Charging networks in Lake Oswego
The following operators run public charging in Lake Oswego, ranked by number of locations.
ChargePoint Network — 19 locations
Blink Network — 11 locations
Tesla Destination — 3 locations
OpConnect — 2 locations
eVgo Network — 1 location
Electrify America — 1 location
EV Connect — 1 location
Featured charging locations in Lake Oswego
A selection of higher-power public charging locations across Lake Oswego, sorted by power level.
New Seasons Palisades — Lake Oswego, OR, 97034 (eVgo Network · DC Fast · 350 kW)
AAA OR ID AAA-LKO2 — Lake Oswego, OR, 97035 (ChargePoint Network · DC Fast · 250 kW)
AAA OR ID AAA-LKO3 — Lake Oswego, OR, 97035 (ChargePoint Network · DC Fast · 250 kW)
Lake Oswego OR1-110 (Lake Oswego, OR) — Lake Oswego, OR, 97034 (Electrify America · DC Fast · 150 kW)
LAKEWOOD EV LAKEWOOD CNTR 1 — Lake Oswego, OR, 97034 (ChargePoint Network · Level 2 · 19.2 kW)
LAKEWOOD EV LAKEWOOD CNTR 3 — Lake Oswego, OR, 97034 (ChargePoint Network · Level 2 · 19.2 kW)
LAKEWOOD EV LAKEWOOD CNTR 2 — Lake Oswego, OR, 97034 (ChargePoint Network · Level 2 · 19.2 kW)
A AVE — Lake Oswego, OR, 97034 (Blink Network · Level 2 · 16.6 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Lake Oswego specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 34 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Lake Oswego, Oregon?
There are 38 public electric vehicle charging locations in Lake Oswego, Oregon, with a combined 104 individual chargers. 4 locations offer DC fast charging and 34 provide Level 2 charging.
What is the largest EV charging network in Lake Oswego?
ChargePoint Network operates the most public charging locations in Lake Oswego with 19 sites, followed by Blink Network with 11 sites.
How much does it cost to install an EV charger in Lake Oswego?
Level 2 EV chargers in Lake Oswego typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lake Oswego?
Most Lake Oswego projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lake Oswego?
A typical commercial Level 2 installation in Lake Oswego energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lake Oswego take to become profitable?
Payback in Lake Oswego depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.