Install EV chargers or analyze a site in Lake Oswego, Oregon. 38 existing public charging locations (4 DC fast, 34 Level 2). Free 0–100 profitability score on any Lake Oswego address from EV Data Map by Charge Rigs.
Lake Oswego, Oregon is served by 38 public electric vehicle charging locations operating 104 individual chargers — an average of 2.7 chargers per site. Of those locations, 4 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 34 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Lake Oswego is ChargePoint Network with 19 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake Oswego and receive an instant ROI score, demand projection, and recommended charger configuration.
Lake Oswego features a robust public EV charging network with 38 locations, including an impressive four DC fast chargers that stand out due to their high power output, averaging 250 kW and reaching up to 350 kW at the fastest stall. With 100% of these fast charging stations rated at 150 kW or greater, EV drivers benefit from efficient and quick charging options. The presence of seven distinct charging operators, led by ChargePoint Network, means that drivers have the flexibility to choose based on power, convenience, and amenities rather than being tied to a single brand. This competitive landscape fosters both accessibility and variety, making Lake Oswego a strategically appealing location for EV infrastructure development focused on meeting the evolving demands of its growing EV community.
DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.7. Average DC fast power: 250 kW.
The following operators run public charging in Lake Oswego, ranked by number of locations.
A selection of higher-power public charging locations across Lake Oswego, sorted by power level.
Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Lake Oswego specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 34 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.