Install EV Chargers in Milwaukie, Oregon

Install EV chargers or analyze a site in Milwaukie, Oregon. 32 existing public charging locations (4 DC fast, 28 Level 2). Free 0–100 profitability score on any Milwaukie address from EV Data Map by Charge Rigs.

Milwaukie, Oregon is served by 32 public electric vehicle charging locations operating 39 individual chargers — an average of 1.2 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Milwaukie is OpConnect with 21 locations, followed by ChargePoint Network with 6. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Milwaukie and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Milwaukie

In Milwaukie, Oregon, the public charging landscape is heavily shaped by the dominance of OpConnect, controlling 66% of the city's 32 charging sites. With a modern fleet of DC fast chargers averaging 160 kW and all sites exceeding 150 kW, the city offers a high-performance charging option for EV drivers. The relatively low share of DC fast charging—only 13%—highlights a potential opportunity for growth, especially as local demand diversifies. Competitors entering the market should note that the concentration of operators can influence network reliability and pricing, making strategic site placement crucial. Additionally, the city’s diverse mix of Level 2 chargers complements fast charging, catering to both quick stops and longer stays for EV users.

Milwaukie charging by the numbers

Locations
32
Chargers
39
DC Fast locations
4
Level 2 locations
28

DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 1.2. Average DC fast power: 160 kW.

Milwaukie charging — local snapshot

Top operator share
OpConnect runs 66% of public locations across 4 networks.
Average DC fast power
160 kW (fastest stall: 160 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 32 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Milwaukie

The following operators run public charging in Milwaukie, ranked by number of locations.

Featured charging locations in Milwaukie

A selection of higher-power public charging locations across Milwaukie, sorted by power level.

  1. PGE MEA DCFC 3 — Milwaukie, OR, 97222 (ChargePoint Network · DC Fast · 160 kW)
  2. PGE MEA DCFC 2 — Milwaukie, OR, 97222 (ChargePoint Network · DC Fast · 160 kW)
  3. PGE MEA DCFC 1 — Milwaukie, OR, 97222 (ChargePoint Network · DC Fast · 160 kW)
  4. PGE MEA DCFC 4 — Milwaukie, OR, 97222 (ChargePoint Network · DC Fast · 160 kW)
  5. Ledding Library (Public Facing) — Milwaukie, OR, 97222 (Blink Network · Level 2 · 19.2 kW)
  6. Public Safety Building (Public Facing) — Milwaukie, OR, 97222 (Blink Network · Level 2 · 16.6 kW)
  7. JCB-CD/Public Works (Public Facing) — Milwaukie, OR, 97206 (Blink Network · Level 2 · 16.6 kW)
  8. 10845 SE Myrtle St, Milwaukie — Milwaukie, OR, 97222 (OpConnect · Level 2 · 9.8 kW)
  9. 9800 SE 36th Ave, Milwaukie — Milwaukie, OR, 97222 (OpConnect · Level 2 · 9.8 kW)
  10. 10735 Southeast 28th Avenue, Milwaukie — Milwaukie, OR, 97222 (OpConnect · Level 2 · 9.8 kW)
  11. 2768 SE Washington St, Milwaukie — Milwaukie, OR, 97222 (OpConnect · Level 2 · 9.8 kW)
  12. 9877 SE 33rd Ave, Milwaukie — Milwaukie, OR, 97222 (OpConnect · Level 2 · 9.8 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Milwaukie specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Milwaukie, Oregon?
There are 32 public electric vehicle charging locations in Milwaukie, Oregon, with a combined 39 individual chargers. 4 locations offer DC fast charging and 28 provide Level 2 charging.
What is the largest EV charging network in Milwaukie?
OpConnect operates the most public charging locations in Milwaukie with 21 sites, followed by ChargePoint Network with 6 sites.
How much does it cost to install an EV charger in Milwaukie?
Level 2 EV chargers in Milwaukie typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Milwaukie?
Most Milwaukie projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Milwaukie?
A typical commercial Level 2 installation in Milwaukie energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Milwaukie take to become profitable?
Payback in Milwaukie depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.