Install EV Chargers in Woodburn, Oregon

Install EV chargers or analyze a site in Woodburn, Oregon. 27 existing public charging locations (3 DC fast, 24 Level 2). Free 0–100 profitability score on any Woodburn address from EV Data Map by Charge Rigs.

Woodburn, Oregon is served by 27 public electric vehicle charging locations operating 52 individual chargers — an average of 1.9 chargers per site. Of those locations, 3 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 24 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Woodburn is OpConnect with 12 locations, followed by ChargePoint Network with 11. Average DC fast power across the city is approximately 192 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Woodburn and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Woodburn

Woodburn, Oregon, boasts a competitive and diverse public charging landscape with 27 locations, including three DC fast chargers that offer impressive averages of 192 kW, positioning the city as a leader in high-power charging options. With 100% of its DC fast sites rated at 150 kW or higher, Woodburn caters to drivers seeking efficiency and fast turnaround times. The presence of six distinct charging networks makes pricing and uptime favorable, allowing drivers to choose chargers based on power output and amenities rather than brand loyalty. This nuanced selection process, combined with the city's robust infrastructure, makes Woodburn an attractive destination for EV users navigating the region.

Woodburn charging by the numbers

Locations
27
Chargers
52
DC Fast locations
3
Level 2 locations
24

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 1.9. Average DC fast power: 192 kW.

Woodburn charging — local snapshot

Top operator share
OpConnect runs 44% of public locations across 6 networks.
Average DC fast power
192 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 27 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Woodburn

The following operators run public charging in Woodburn, ranked by number of locations.

Featured charging locations in Woodburn

A selection of higher-power public charging locations across Woodburn, sorted by power level.

  1. Elmer's Restaurant - Tesla Supercharger — Woodburn, OR, 97071 (Tesla · DC Fast · 250 kW)
  2. WCEH Woodburn — Woodburn, OR, 97071 (EVCS · DC Fast · 175 kW)
  3. Simon Woodburn Premium Outlets (Woodburn, OR) — Woodburn, OR, 97071 (Electrify America · DC Fast · 150 kW)
  4. 1113 Johnson St, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.8 kW)
  5. 1515 Laurel Avenue, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  6. 545 4th Street, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  7. 1405 George Street, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  8. 380 Stark Street, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  9. 1061 Bryan Street, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  10. 790 6th Street, Woodburn — Woodburn, OR, 97097 (OpConnect · Level 2 · 9.6 kW)
  11. 543 Doud St, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)
  12. 1265 George Street, Woodburn — Woodburn, OR, 97071 (OpConnect · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Woodburn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 24 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Woodburn, Oregon?
There are 27 public electric vehicle charging locations in Woodburn, Oregon, with a combined 52 individual chargers. 3 locations offer DC fast charging and 24 provide Level 2 charging.
What is the largest EV charging network in Woodburn?
OpConnect operates the most public charging locations in Woodburn with 12 sites, followed by ChargePoint Network with 11 sites.
How much does it cost to install an EV charger in Woodburn?
Level 2 EV chargers in Woodburn typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Woodburn?
Most Woodburn projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Woodburn?
A typical commercial Level 2 installation in Woodburn energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Woodburn take to become profitable?
Payback in Woodburn depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.