Install EV chargers or analyze a site in Wilsonville, Oregon. 17 existing public charging locations (6 DC fast, 11 Level 2). Free 0–100 profitability score on any Wilsonville address from EV Data Map by Charge Rigs.
Wilsonville, Oregon is served by 17 public electric vehicle charging locations operating 40 individual chargers — an average of 2.4 chargers per site. Of those locations, 6 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Wilsonville is ChargePoint Network with 9 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 206 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wilsonville and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Wilsonville
Wilsonville stands out in the EV charging landscape with a robust mix of 17 public charging locations, featuring a significant 35% dedicated to DC fast charging. This creates a competitive environment driven by six distinct operators, predominantly ChargePoint Network, which alone accounts for 53% of the sites. The average DC fast unit delivers an impressive 206 kW, and with 67% of these charging hubs classified at 150 kW or higher, drivers benefit from ultra-fast charging options that enhance their experience. The eclectic mix of fast and Level 2 chargers caters to varying driver needs, enabling more informed choices based on power levels and amenities, while making Wilsonville an attractive hub for EV users in the region.
Wilsonville charging by the numbers
Locations
17
Chargers
40
DC Fast locations
6
Level 2 locations
11
DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 2.4. Average DC fast power: 206 kW.
Wilsonville charging — local snapshot
Top operator share
ChargePoint Network runs 53% of public locations across 6 networks.
Average DC fast power
206 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 17 locations
Estimated DC ports
16 fast-charging ports city-wide
Charging networks in Wilsonville
The following operators run public charging in Wilsonville, ranked by number of locations.
ChargePoint Network — 9 locations
Blink Network — 3 locations
Non-Networked — 2 locations
Electrify America — 1 location
Tesla — 1 location
EVGATEWAY — 1 location
Featured charging locations in Wilsonville
A selection of higher-power public charging locations across Wilsonville, sorted by power level.
Kroger-Fred Meyer 516 (Wilsonville, OR) — Wilsonville, OR, 97070 (Electrify America · DC Fast · 350 kW)
Argyle Square - Tesla Supercharger — Wilsonville, OR, 97070 (Tesla · DC Fast · 325 kW)
PGE WEA DCFC2 — Wilsonville, OR, 97070 (ChargePoint Network · DC Fast · 160 kW)
PGE WEA DCFC 1 — Wilsonville, OR, 97070 (ChargePoint Network · DC Fast · 160 kW)
PGE WEA DCFC3 — Wilsonville, OR, 97070 (ChargePoint Network · DC Fast · 120 kW)
PGE WEA DCFC4 — Wilsonville, OR, 97070 (ChargePoint Network · DC Fast · 120 kW)
Oregon Charter Academy — Wilsonville, OR, 97070 (Blink Network · Level 2 · 10.4 kW)
OREGON TECH EV STATION 2 — Wilsonville, OR, 97070 (ChargePoint Network · Level 2 · 9.6 kW)
Wilsonville Public Works — Wilsonville, OR, 97070 (EVGATEWAY · Level 2 · 9.6 kW)
OREGON TECH EV STATION 1 — Wilsonville, OR, 97070 (ChargePoint Network · Level 2 · 9.6 kW)
Clackamas Community College – Wilsonville Campus — Wilsonville, OR, 97070 (Blink Network · Level 2 · 8.6 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Wilsonville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Wilsonville, Oregon?
There are 17 public electric vehicle charging locations in Wilsonville, Oregon, with a combined 40 individual chargers. 6 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Wilsonville?
ChargePoint Network operates the most public charging locations in Wilsonville with 9 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Wilsonville?
Level 2 EV chargers in Wilsonville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wilsonville?
Most Wilsonville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wilsonville?
A typical commercial Level 2 installation in Wilsonville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wilsonville take to become profitable?
Payback in Wilsonville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.