Install EV Chargers in McMinnville, Oregon

Install EV chargers or analyze a site in McMinnville, Oregon. 15 existing public charging locations (2 DC fast, 13 Level 2). Free 0–100 profitability score on any McMinnville address from EV Data Map by Charge Rigs.

McMinnville, Oregon is served by 15 public electric vehicle charging locations operating 29 individual chargers — an average of 1.9 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in McMinnville is Tesla Destination with 4 locations, followed by ChargePoint Network with 3. Average DC fast power across the city is approximately 85 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in McMinnville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in McMinnville

McMinnville boasts a diverse public charging infrastructure with 15 locations, comprising 2 DC fast chargers and 13 Level 2 units, supported by 7 distinct operators. This variety ensures competitive pricing and availability for EV drivers, with Tesla Destination leading at 27% of the sites. The average power at the fast chargers is 85 kW, with the quickest stall reaching 120 kW, indicating an older infrastructure compared to newer high-capacity chargers. The relatively low 13% share of DC fast locations highlights a significant opportunity for expansion in high-power charging options, catering to the demand from drivers using navigation apps who prioritize charging speed and convenience. Additionally, the mix of longer-dwell Level 2 chargers caters well to local needs, enhancing McMinnville's appeal as an EV-friendly destination.

McMinnville charging by the numbers

Locations
15
Chargers
29
DC Fast locations
2
Level 2 locations
13

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 1.9. Average DC fast power: 85 kW.

McMinnville charging — local snapshot

Top operator share
Tesla Destination runs 27% of public locations across 7 networks.
Average DC fast power
85 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 15 locations
Estimated DC ports
5 fast-charging ports city-wide

Charging networks in McMinnville

The following operators run public charging in McMinnville, ranked by number of locations.

Featured charging locations in McMinnville

A selection of higher-power public charging locations across McMinnville, sorted by power level.

  1. Chuck Colvin Auto Center — McMinnville, OR, 97128 (FORD_CHARGE · DC Fast · 120 kW)
  2. WCEH McMinnville — McMinnville, OR, 97128 (EVCS · DC Fast · 50 kW)
  3. Chemeketa Yamhill Valley Campus — McMinnville, OR, 97128 (Blink Network · Level 2 · 7.3 kW)
  4. Lawrence Gallery - Tesla Destination — McMinnville, OR, 97128 (Tesla Destination · Level 2 · 7.2 kW)
  5. Yamhill Valley Vineyards - Tesla Destination — McMinnville, OR, 97128 (Tesla Destination · Level 2 · 7.2 kW)
  6. Atticus Hotel - Tesla Destination — McMinnville, OR, 97128 (Tesla Destination · Level 2 · 7.2 kW)
  7. Youngberg Hill, a Select Registry Property - Tesla Destination — McMinnville, OR, 97128 (Tesla Destination · Level 2 · 7.2 kW)
  8. Big Box Returns — McMinnville, OR, 97128 (EVGATEWAY · Level 2 · 7.2 kW)
  9. Yamhill Valley Vineyard — McMinnville, OR, 97128 (Non-Networked · Level 2 · 7.2 kW)
  10. Farnham Electric Construction — McMinnville, OR, 97128 (Non-Networked · Level 2 · 7.2 kW)
  11. Youngberg Hill Vineyards — McMinnville, OR, 97128 (Non-Networked · Level 2 · 7 kW)
  12. LINFIELD FOUNTAIN — McMinnville, OR, 97128 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For McMinnville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in McMinnville, Oregon?
There are 15 public electric vehicle charging locations in McMinnville, Oregon, with a combined 29 individual chargers. 2 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in McMinnville?
Tesla Destination operates the most public charging locations in McMinnville with 4 sites, followed by ChargePoint Network with 3 sites.
How much does it cost to install an EV charger in McMinnville?
Level 2 EV chargers in McMinnville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in McMinnville?
Most McMinnville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in McMinnville?
A typical commercial Level 2 installation in McMinnville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in McMinnville take to become profitable?
Payback in McMinnville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage