Install EV Chargers in Carlisle, Pennsylvania

Install EV chargers or analyze a site in Carlisle, Pennsylvania. 14 existing public charging locations (4 DC fast, 10 Level 2). Free 0–100 profitability score on any Carlisle address from EV Data Map by Charge Rigs.

Carlisle, Pennsylvania is served by 14 public electric vehicle charging locations operating 42 individual chargers — an average of 3.0 chargers per site. Of those locations, 4 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carlisle is ChargePoint Network with 3 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 313 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carlisle and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carlisle

Carlisle, Pennsylvania, boasts a competitive and diverse EV charging landscape with 14 public charging locations featuring 10 distinct operators. This variety fosters a dynamic market where drivers can choose based on power and amenities rather than affinity to specific brands. The four DC fast charging sites stand out with an impressive average power of 313 kW, ensuring quick turnarounds for EVs, and the fastest stall reaching 400 kW positions Carlisle among the leading cities for rapid charging infrastructure. With 100% of these fast chargers rated at 150 kW or higher, the city not only meets current demands but also attracts new operators looking to enter the market with competitive power options.

Carlisle charging by the numbers

Locations
14
Chargers
42
DC Fast locations
4
Level 2 locations
10

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 3.0. Average DC fast power: 313 kW.

Carlisle charging — local snapshot

Top operator share
ChargePoint Network runs 21% of public locations across 10 networks.
Average DC fast power
313 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 14 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Carlisle

The following operators run public charging in Carlisle, ranked by number of locations.

Featured charging locations in Carlisle

A selection of higher-power public charging locations across Carlisle, sorted by power level.

  1. Sheetz #263 - Carlisle — Carlisle, PA, 17013 (FCN · DC Fast · 400 kW)
  2. Sheetz 191 (Carlisle, PA) — Carlisle, PA, 17013 (Electrify America · DC Fast · 350 kW)
  3. Flying J 708 — Carlisle, PA, 17013 (eVgo Network · DC Fast · 350 kW)
  4. Sheetz - Tesla Supercharger — Carlisle, PA, 17015 (Tesla · DC Fast · 150 kW)
  5. USA Spares — Carlisle, PA, 17015 (Blink Network · Level 2 · 13 kW)
  6. Carlisle Country Inn & Suites by Radisson — Carlisle, PA, 17015 (CHARGELAB · Level 2 · 9.6 kW)
  7. Dickinson College — Carlisle, PA, 17013 (Non-Networked · Level 2 · 7.2 kW)
  8. Dickinson College — Carlisle, PA, 17013 (Non-Networked · Level 2 · 7.2 kW)
  9. UPMC Carlisle/Magee Women's Center — Carlisle, PA, 17015 (CORAL_EV · Level 2 · 7.2 kW)
  10. Carlisle House Bed & Breakfast - Tesla Destination — Carlisle, PA, 17013 (Tesla Destination · Level 2 · 7.2 kW)
  11. Dickinson College — Carlisle, PA, 17013 (Non-Networked · Level 2 · 7.2 kW)
  12. CARLISLE BORO GARAGE #2 — Carlisle, PA, 17013 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carlisle specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carlisle, Pennsylvania?
There are 14 public electric vehicle charging locations in Carlisle, Pennsylvania, with a combined 42 individual chargers. 4 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Carlisle?
ChargePoint Network operates the most public charging locations in Carlisle with 3 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Carlisle?
Level 2 EV chargers in Carlisle typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carlisle?
Most Carlisle projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carlisle?
A typical commercial Level 2 installation in Carlisle energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carlisle take to become profitable?
Payback in Carlisle depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage