Install EV Chargers in Johnston, Rhode Island

Install EV chargers or analyze a site in Johnston, Rhode Island. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Johnston address from EV Data Map by Charge Rigs.

Johnston, Rhode Island is served by 11 public electric vehicle charging locations operating 34 individual chargers — an average of 3.1 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Johnston is ChargePoint Network with 7 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 143 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Johnston and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Johnston

Johnston, Rhode Island's EV charging landscape features a strong presence of ChargePoint Network, which operates 64% of the city's 11 public charging sites, offering significant reliability and consistency for users. With only three DC fast locations averaging 143 kW, including a peak of 180 kW, the region’s charging offerings are primarily mid-range, presenting an opportunity for new entrants to introduce higher-capacity stations. Notably, over one-third of Johnston's DC fast chargers are 150 kW-class or greater, indicating a demand for faster charging solutions that can attract EV drivers seeking quick top-offs. As 73% of the charging locations provide Level 2 options, understanding this mix can guide developers in strategically positioning new infrastructure to capture both fast-charging and longer-dwell needs in the market.

Johnston charging by the numbers

Locations
11
Chargers
34
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.1. Average DC fast power: 143 kW.

Johnston charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 4 networks.
Average DC fast power
143 kW (fastest stall: 180 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Johnston

The following operators run public charging in Johnston, ranked by number of locations.

Featured charging locations in Johnston

A selection of higher-power public charging locations across Johnston, sorted by power level.

  1. 525 Killingly St — JOHNSTON, RI, 02919 (SHELL_RECHARGE · DC Fast · 180 kW)
  2. PICK & PAY DCF EV 1 — Johnston, RI, 02919 (ChargePoint Network · DC Fast · 125 kW)
  3. PICK & PAY DCF EV2 — Johnston, RI, 02919 (ChargePoint Network · DC Fast · 125 kW)
  4. FM Global Corporate Headquarters — Johnston, RI, 2919 (Blink Network · Level 2 · 11.5 kW)
  5. Citizen's Bank Johnston — Johnston, RI, 02919 (AMPUP · Level 2 · 7.2 kW)
  6. MA PORTFOLIO HBM NORTHWOOD 1 — Johnston, RI, 02919 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MA PORTFOLIO HBM NORTHWOOD 3 — Johnston, RI, 02919 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MA PORTFOLIO HBM NORTHWOOD 2 — Johnston, RI, 02919 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MA PORTFOLIO HBM NORTHWOOD 5 — Johnston, RI, 02919 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MA PORTFOLIO HBM NORTHWOOD 4 — Johnston, RI, 02919 (ChargePoint Network · Level 2 · 6.5 kW)
  11. AIPSO — Johnston, RI, 2919 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Rhode Island we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Johnston specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Johnston, Rhode Island?
There are 11 public electric vehicle charging locations in Johnston, Rhode Island, with a combined 34 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Johnston?
ChargePoint Network operates the most public charging locations in Johnston with 7 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Johnston?
Level 2 EV chargers in Johnston typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Johnston?
Most Johnston projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Rhode Island state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Johnston?
A typical commercial Level 2 installation in Johnston energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Johnston take to become profitable?
Payback in Johnston depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage