Install EV Chargers in Clarksville, Tennessee

Install EV chargers or analyze a site in Clarksville, Tennessee. 22 existing public charging locations (8 DC fast, 14 Level 2). Free 0–100 profitability score on any Clarksville address from EV Data Map by Charge Rigs.

Clarksville, Tennessee is served by 22 public electric vehicle charging locations operating 64 individual chargers — an average of 2.9 chargers per site. Of those locations, 8 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Clarksville is ChargePoint Network with 14 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 223 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Clarksville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Clarksville

Clarksville, Tennessee's public EV charging landscape is characterized by a strong dependence on the ChargePoint Network, which accounts for 64% of the 22 public charging locations. With 36% of these sites offering DC fast charging and an impressive average power output of 223 kW—peaking at 350 kW—Clarksville provides a competitive edge for fast-charging capabilities. Notably, 63% of the DC fast chargers exceed the 150 kW mark, aligning with drivers’ preferences for rapid service. For site developers, this concentration and performance in the high-power segment underscore a strategic opportunity to introduce alternative charging solutions that can meet local demand and potentially leverage the current power curve for differentiation in a growing market.

Clarksville charging by the numbers

Locations
22
Chargers
64
DC Fast locations
8
Level 2 locations
14

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 2.9. Average DC fast power: 223 kW.

Clarksville charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 7 networks.
Average DC fast power
223 kW (fastest stall: 350 kW)
High-power share
63% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 22 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Clarksville

The following operators run public charging in Clarksville, ranked by number of locations.

Featured charging locations in Clarksville

A selection of higher-power public charging locations across Clarksville, sorted by power level.

  1. Walmart 673 (Clarksville, TN) — Clarksville, TN, 37040 (Electrify America · DC Fast · 350 kW)
  2. Steak 'n Shake - Tesla Supercharger — Clarksville, TN, 37040 (Tesla · DC Fast · 325 kW)
  3. Jenkins & Wynne Ford, Lincoln, Honda — Clarksville, TN, 37040 (Blink Network · DC Fast · 300 kW)
  4. I24 EXIT11 STATION 2 (LM) — Clarksville, TN, 37043 (ChargePoint Network · DC Fast · 250 kW)
  5. I24 EXIT11 STATION 1 (LL) — Clarksville, TN, 37043 (ChargePoint Network · DC Fast · 250 kW)
  6. I24 EXIT11 STATION 3 (RM) — Clarksville, TN, 37043 (ChargePoint Network · DC Fast · 125 kW)
  7. I24 EXIT11 STATION 4 (RR) — Clarksville, TN, 37043 (ChargePoint Network · DC Fast · 125 kW)
  8. Wyatt Johnson Subaru — Clarksville, TN, 37040 (Blink Network · DC Fast · 60 kW)
  9. Dunbar Cave State Park — Clarksville, TN, 37043 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  10. Cumberland Plaza Garage — Clarksville, TN, 37040 (Non-Networked · Level 2 · 7.2 kW)
  11. Old Glory Distilling Co. - Tesla Destination — Clarksville, TN, 37040 (Tesla Destination · Level 2 · 7.2 kW)
  12. Home2 Suites by Hilton Clarksville/Ft. Campbell - Tesla Destination — Clarksville, TN, 37040 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Clarksville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Clarksville, Tennessee?
There are 22 public electric vehicle charging locations in Clarksville, Tennessee, with a combined 64 individual chargers. 8 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Clarksville?
ChargePoint Network operates the most public charging locations in Clarksville with 14 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Clarksville?
Level 2 EV chargers in Clarksville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Clarksville?
Most Clarksville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Clarksville?
A typical commercial Level 2 installation in Clarksville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Clarksville take to become profitable?
Payback in Clarksville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.