Install EV chargers or analyze a site in Baytown, Texas. 12 existing public charging locations (5 DC fast, 7 Level 2). Free 0–100 profitability score on any Baytown address from EV Data Map by Charge Rigs.
Baytown, Texas is served by 12 public electric vehicle charging locations operating 58 individual chargers — an average of 4.8 chargers per site. Of those locations, 5 (42%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (58%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Baytown is ChargePoint Network with 6 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 280 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Baytown and receive an instant ROI score, demand projection, and recommended charger configuration.
Baytown boasts a competitive public charging landscape with 12 locations, including five DC fast chargers, representing a substantial 42% of the total. This diversity, highlighted by the prevalence of ChargePoint Network, which operates half of the sites, encourages drivers to select charging points based on power and amenities rather than sticking to a single brand. With an impressive average output of 280 kW and a top stall reaching 400 kW, Baytown's fast-charging options are among the fastest in the country, ensuring drivers can quickly recharge. Additionally, the presence of both fast and Level 2 chargers allows flexibility for varied charging needs, positioning Baytown as a strategic hub for EV charging in the region.
DC fast share: 42% of locations. Level 2 share: 58%. Average chargers per site: 4.8. Average DC fast power: 280 kW.
The following operators run public charging in Baytown, ranked by number of locations.
A selection of higher-power public charging locations across Baytown, sorted by power level.
Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Baytown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.