Install EV chargers or analyze a site in Humble, Texas. 13 existing public charging locations (5 DC fast, 8 Level 2). Free 0–100 profitability score on any Humble address from EV Data Map by Charge Rigs.
Humble, Texas is served by 13 public electric vehicle charging locations operating 67 individual chargers — an average of 5.2 chargers per site. Of those locations, 5 (38%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (62%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Humble is Tesla Destination with 4 locations, followed by GRAVITI_ENERGY with 3. Average DC fast power across the city is approximately 194 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Humble and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Humble
Humble, Texas boasts a dynamic public charging landscape with 13 locations across 8 distinct networks, fostering competition and choice for electric vehicle drivers. Tesla Destination leads with 31% of the sites, but the presence of multiple operators allows users to prioritize charging power and amenities. The city's 5 DC fast charging stations, averaging an impressive 194 kW, underline Humble's commitment to high-speed charging; notably, 80% of these outlets are 150 kW-class or higher, accommodating the increasing demand for fast charging solutions. This blend of infrastructure and diversity positions Humble as an attractive hub for EV owners selecting the best charging experience in the region.
Humble charging by the numbers
Locations
13
Chargers
67
DC Fast locations
5
Level 2 locations
8
DC fast share: 38% of locations. Level 2 share: 62%. Average chargers per site: 5.2. Average DC fast power: 194 kW.
Humble charging — local snapshot
Top operator share
Tesla Destination runs 31% of public locations across 8 networks.
Average DC fast power
194 kW (fastest stall: 350 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
38% DC fast / 62% Level 2 across 13 locations
Estimated DC ports
32 fast-charging ports city-wide
Charging networks in Humble
The following operators run public charging in Humble, ranked by number of locations.
Tesla Destination — 4 locations
GRAVITI_ENERGY — 3 locations
Blink Network — 1 location
Tesla — 1 location
UNIVERSAL — 1 location
SHELL_RECHARGE — 1 location
7CHARGE — 1 location
ChargePoint Network — 1 location
Featured charging locations in Humble
A selection of higher-power public charging locations across Humble, sorted by power level.
Humble TX — Humble, TX, 77396 (SHELL_RECHARGE · DC Fast · 350 kW)
Ramada by Wyndham Houston Intercontinental Airport East - Tesla Supercharger — Humble, TX, 77338 (Tesla · DC Fast · 250 kW)
7Charge - Humble 42059 — Humble, TX, 77338 (7CHARGE · DC Fast · 180 kW)
Shell Gas Truck Stop — Humble, TX, 77396 (GRAVITI_ENERGY · DC Fast · 150 kW)
Palace Inn IAH East — Humble, TX, 77396 (GRAVITI_ENERGY · DC Fast · 40 kW)
The Sarah at Lake Houston — Humble, TX, 77346 (GRAVITI_ENERGY · Level 2 · 7.7 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Humble specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Humble, Texas?
There are 13 public electric vehicle charging locations in Humble, Texas, with a combined 67 individual chargers. 5 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Humble?
Tesla Destination operates the most public charging locations in Humble with 4 sites, followed by GRAVITI_ENERGY with 3 sites.
How much does it cost to install an EV charger in Humble?
Level 2 EV chargers in Humble typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Humble?
Most Humble projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Humble?
A typical commercial Level 2 installation in Humble energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Humble take to become profitable?
Payback in Humble depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.