Install EV chargers or analyze a site in Killeen, Texas. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Killeen address from EV Data Map by Charge Rigs.
Killeen, Texas is served by 12 public electric vehicle charging locations operating 23 individual chargers — an average of 1.9 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Killeen is Non-Networked with 4 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Killeen and receive an instant ROI score, demand projection, and recommended charger configuration.
Killeen’s public EV charging landscape stands out due to its diverse operator mix and competitive local market. With 12 public charging locations spanning five distinct networks, including a notable 33% of sites operated by Non-Networked providers, drivers benefit from varied pricing and availability. However, while the 17% of DC fast chargers average 63 kW, this relatively low power output may influence user preferences as newer, higher-capacity options emerge nearby. The lack of 150 kW-class or higher DC fast chargers signals an opportunity for future development. As Killeen integrates its charging infrastructure, apps will increasingly guide drivers to select locations based on power and amenities, making strategic site development critical to meet evolving demands.
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 1.9. Average DC fast power: 63 kW.
The following operators run public charging in Killeen, ranked by number of locations.
A selection of higher-power public charging locations across Killeen, sorted by power level.
Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Killeen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.