Install EV chargers or analyze a site in Killeen, Texas. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Killeen address from EV Data Map by Charge Rigs.
Killeen, Texas is served by 12 public electric vehicle charging locations operating 23 individual chargers — an average of 1.9 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Killeen is Non-Networked with 4 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Killeen and receive an instant ROI score, demand projection, and recommended charger configuration.
Killeen's EV charging landscape features a unique blend of competition and choice, with 12 public charging locations under five distinct operators, enriching the landscape for local drivers. Notably, Non-Networked leads with a third of the sites, fostering competitive pricing and reliability. The city’s two DC fast chargers, averaging 63 kW, represent a legacy system lacking in higher power options, as none reach the 150 kW threshold. This creates opportunities for new infrastructure to cater to the growing demand for faster charging. With 17% of public chargers classified as DC fast, Killeen effectively balances the immediate needs of quick turnaround charges against longer-stay Level 2 options, signaling strategic areas for expansion in the evolving EV market.
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 1.9. Average DC fast power: 63 kW.
The following operators run public charging in Killeen, ranked by number of locations.
A selection of higher-power public charging locations across Killeen, sorted by power level.
Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Killeen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.