Install EV Chargers in Conroe, Texas

Install EV chargers or analyze a site in Conroe, Texas. 16 existing public charging locations (4 DC fast, 12 Level 2). Free 0–100 profitability score on any Conroe address from EV Data Map by Charge Rigs.

Conroe, Texas is served by 16 public electric vehicle charging locations operating 38 individual chargers — an average of 2.4 chargers per site. Of those locations, 4 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Conroe is ChargePoint Network with 8 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Conroe and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Conroe

Conroe’s public EV charging landscape features a competitive mix of 16 locations, showcasing 7 distinct operators while boasting ChargePoint Network as the market leader, present at half of all sites. This diversity not only enhances pricing and reliability but also allows drivers to choose charging options based on power and amenities. The city’s 4 DC fast charging stations average a robust 160 kW, with one reaching an impressive 350 kW, ensuring that high-demand drivers can find sufficient power. Notably, 50% of DC fast sites are 150 kW-class or higher, making Conroe an attractive option for those needing rapid charging solutions, with a strategic blend of fast and Level 2 locations addressing various charging needs across the city.

Conroe charging by the numbers

Locations
16
Chargers
38
DC Fast locations
4
Level 2 locations
12

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 2.4. Average DC fast power: 160 kW.

Conroe charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 7 networks.
Average DC fast power
160 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 16 locations
Estimated DC ports
13 fast-charging ports city-wide

Charging networks in Conroe

The following operators run public charging in Conroe, ranked by number of locations.

Featured charging locations in Conroe

A selection of higher-power public charging locations across Conroe, sorted by power level.

  1. 1200 League Line Rd — Conroe, TX, 77303 (SHELL_RECHARGE · DC Fast · 350 kW)
  2. Gullo Ford of Conroe — Conroe, TX, 77301 (EV Connect · DC Fast · 180 kW)
  3. Wiesner of Conroe — Conroe, TX, 77304 (Non-Networked · DC Fast · 60 kW)
  4. Yippee’s — Conroe, TX, 77304 (Non-Networked · DC Fast · 50 kW)
  5. Bluskyev Test Facility — Conroe, TX, 77304 (NOODOE · Level 2 · 22 kW)
  6. Buckalew Chevrolet — Conroe, TX, 77301 (EV Connect · Level 2 · 19.2 kW)
  7. La Quinta Inn & Suites by Wyndham Conroe — Conroe, TX, 77303 (UNIVERSAL · Level 2 · 11.2 kW)
  8. Galaxy FBO Hangar - Tesla Destination — Conroe, TX, 77303 (Tesla Destination · Level 2 · 7.2 kW)
  9. THE WOODLANDS BAY 5 — Conroe, TX, 77385 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BMW WOODLANDS STATION 01 — Conroe, TX, 77384 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BMW WOODLANDS STATION 1 — Conroe, TX, 77384 (ChargePoint Network · Level 2 · 6.5 kW)
  12. EV#1 EV #1 — Conroe, TX, 77304 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Conroe specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Conroe, Texas?
There are 16 public electric vehicle charging locations in Conroe, Texas, with a combined 38 individual chargers. 4 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Conroe?
ChargePoint Network operates the most public charging locations in Conroe with 8 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Conroe?
Level 2 EV chargers in Conroe typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Conroe?
Most Conroe projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Conroe?
A typical commercial Level 2 installation in Conroe energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Conroe take to become profitable?
Payback in Conroe depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage