Install EV chargers or analyze a site in New Braunfels, Texas. 11 existing public charging locations (6 DC fast, 5 Level 2). Free 0–100 profitability score on any New Braunfels address from EV Data Map by Charge Rigs.
New Braunfels, Texas is served by 11 public electric vehicle charging locations operating 60 individual chargers — an average of 5.5 chargers per site. Of those locations, 6 (55%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (45%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in New Braunfels is ChargePoint Network with 2 locations, followed by EVRANGE with 1. Average DC fast power across the city is approximately 295 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in New Braunfels and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in New Braunfels
New Braunfels boasts a diverse charging landscape with 11 public locations across 10 distinct operators, fostering competitive pricing and uptime. Notably, 55% of these sites feature DC fast charging, with an impressive average power of 295 kW, including a peak of 400 kW. All DC fast locations are rated 150 kW or above, positioning the city as a strong player for ultra-fast charging options. The presence of multiple operators enhances the selection process for drivers, allowing them to prioritize charging speed and amenities rather than being tied to a single network. This nuanced market supports the growing demand for EV infrastructure, providing a vital resource for the increasing number of electric vehicle users in the region.
New Braunfels charging by the numbers
Locations
11
Chargers
60
DC Fast locations
6
Level 2 locations
5
DC fast share: 55% of locations. Level 2 share: 45%. Average chargers per site: 5.5. Average DC fast power: 295 kW.
New Braunfels charging — local snapshot
Top operator share
ChargePoint Network runs 18% of public locations across 10 networks.
Average DC fast power
295 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
55% DC fast / 45% Level 2 across 11 locations
Estimated DC ports
50 fast-charging ports city-wide
Charging networks in New Braunfels
The following operators run public charging in New Braunfels, ranked by number of locations.
ChargePoint Network — 2 locations
EVRANGE — 1 location
Tesla — 1 location
Non-Networked — 1 location
FORD_CHARGE — 1 location
SHELL_RECHARGE — 1 location
MERCEDES_BENZ — 1 location
Electrify America — 1 location
Featured charging locations in New Braunfels
A selection of higher-power public charging locations across New Braunfels, sorted by power level.
Bucees New Braunfels MB.HPC — New Braunfels, TX, 78130 (MERCEDES_BENZ · DC Fast · 400 kW)
Target T2429 (New Braunfels, TX) — New Braunfels, TX, 78130 (Electrify America · DC Fast · 350 kW)
Pilot Travel Center 330 — New Braunfels, TX, 78132 (eVgo Network · DC Fast · 350 kW)
Buc-ee's - Tesla Supercharger — New Braunfels, TX, 78130 (Tesla · DC Fast · 250 kW)
Bluebonnet Ford — New Braunfels, TX, 78130 (FORD_CHARGE · DC Fast · 240 kW)
2308 W State Highway 46 New Braunfels Tx — New Braunfels, TX, 78132 (SHELL_RECHARGE · DC Fast · 180 kW)
Gruene Solar EV - New Braunfels, TX — New Braunfels, TX, 78130 (EVRANGE · Level 2 · 9.6 kW)
Homewood Suites - New Braunfels — New Braunfels, TX, 78130 (Non-Networked · Level 2 · 7.2 kW)
Courtyard Marriott New Braunfels River Village - Tesla Destination — New Braunfels, TX, 78130 (Tesla Destination · Level 2 · 7.2 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For New Braunfels specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in New Braunfels, Texas?
There are 11 public electric vehicle charging locations in New Braunfels, Texas, with a combined 60 individual chargers. 6 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in New Braunfels?
ChargePoint Network operates the most public charging locations in New Braunfels with 2 sites, followed by EVRANGE with 1 sites.
How much does it cost to install an EV charger in New Braunfels?
Level 2 EV chargers in New Braunfels typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in New Braunfels?
Most New Braunfels projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in New Braunfels?
A typical commercial Level 2 installation in New Braunfels energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in New Braunfels take to become profitable?
Payback in New Braunfels depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.