Install EV chargers or analyze a site in San Antonio, Texas. 210 existing public charging locations (41 DC fast, 169 Level 2). Free 0–100 profitability score on any San Antonio address from EV Data Map by Charge Rigs.
San Antonio, Texas is served by 210 public electric vehicle charging locations operating 637 individual chargers — an average of 3.0 chargers per site. Of those locations, 41 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 169 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in San Antonio is ChargePoint Network with 117 locations, followed by Blink Network with 26. Average DC fast power across the city is approximately 203 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in San Antonio and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in San Antonio
San Antonio stands out in the EV charging landscape with its competitive market featuring 210 public charging locations across 20 distinct operators. ChargePoint Network dominates the scene with 56% of the sites, fostering competitive pricing and uptime for users. Notably, 20% of these locations are DC fast chargers, averaging an impressive 202 kW, with 68% classified as 150 kW or higher—making it a particularly appealing destination for drivers seeking rapid charging solutions. The presence of ultra-fast options—like the fastest stall at 400 kW—enhances the city’s allure for EV users, while a mix of Level 2 chargers caters to those with longer dwell times, ensuring a comprehensive network that effectively meets diverse charging needs.
San Antonio charging by the numbers
Locations
210
Chargers
637
DC Fast locations
41
Level 2 locations
169
DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 3.0. Average DC fast power: 203 kW.
San Antonio charging — local snapshot
Top operator share
ChargePoint Network runs 56% of public locations across 20 networks.
Average DC fast power
203 kW (fastest stall: 400 kW)
High-power share
71% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 210 locations
Estimated DC ports
230 fast-charging ports city-wide
Charging networks in San Antonio
The following operators run public charging in San Antonio, ranked by number of locations.
ChargePoint Network — 117 locations
Blink Network — 26 locations
Tesla Destination — 16 locations
Non-Networked — 8 locations
Tesla — 7 locations
UNIVERSAL — 6 locations
eVgo Network — 5 locations
LOOP — 4 locations
Featured charging locations in San Antonio
A selection of higher-power public charging locations across San Antonio, sorted by power level.
TA, I-10 East, San Antonio, TX — San Antonio, TX, 78219 (BP_PULSE · DC Fast · 400 kW)
Flying J 737 — San Antonio, TX, 78244 (eVgo Network · DC Fast · 350 kW)
Pilot Travel Center 467 — San Antonio, TX, 78264 (eVgo Network · DC Fast · 350 kW)
Target San Antonio #T1785 — San Antonio, TX, 78250 (eVgo Network · DC Fast · 350 kW)
Heritage Square Shopping Center — San Antonio, TX, 78227 (eVgo Network · DC Fast · 350 kW)
Walmart 1803 (San Antonio, TX) — San Antonio, TX, 78217 (Electrify America · DC Fast · 350 kW)
San Antonio TX- TPG — San Antonio, TX, 78257 (SHELL_RECHARGE · DC Fast · 350 kW)
Target T2187 (San Antonio, TX) — San Antonio, TX, 78257 (Electrify America · DC Fast · 350 kW)
Target San Antonio #T0771 — San Antonio, TX, 78224 (eVgo Network · DC Fast · 350 kW)
San Antonio, TX — San Antonio, TX, 78256 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
The RIM - Tesla Supercharger — San Antonio, TX, 78257 (Tesla · DC Fast · 250 kW)
SLUMBER PASS EX BIG'S 210 #2 — San Antonio, TX, 78260 (ChargePoint Network · DC Fast · 250 kW)
Nearby cities with EV charging coverage
Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For San Antonio specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 41 DC fast and 169 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in San Antonio, Texas?
There are 210 public electric vehicle charging locations in San Antonio, Texas, with a combined 637 individual chargers. 41 locations offer DC fast charging and 169 provide Level 2 charging.
What is the largest EV charging network in San Antonio?
ChargePoint Network operates the most public charging locations in San Antonio with 117 sites, followed by Blink Network with 26 sites.
How much does it cost to install an EV charger in San Antonio?
Level 2 EV chargers in San Antonio typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in San Antonio?
Most San Antonio projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in San Antonio?
A typical commercial Level 2 installation in San Antonio energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in San Antonio take to become profitable?
Payback in San Antonio depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.