Install EV Chargers in San Angelo, Texas

Install EV chargers or analyze a site in San Angelo, Texas. 12 existing public charging locations (4 DC fast, 8 Level 2). Free 0–100 profitability score on any San Angelo address from EV Data Map by Charge Rigs.

San Angelo, Texas is served by 12 public electric vehicle charging locations operating 32 individual chargers — an average of 2.7 chargers per site. Of those locations, 4 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in San Angelo is ChargePoint Network with 4 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 138 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in San Angelo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in San Angelo

San Angelo's EV charging landscape stands out with its combination of six distinct operators across 12 public charging locations, fostering a competitive environment that enhances pricing and uptime. The 4 DC fast charging sites, averaging 138 kW and featuring a peak of 250 kW, support a diverse range of driver needs, particularly with 25% of these stations rated at 150 kW or higher. This mid-power fleet enables drivers to make strategic choices based on charging speed and site amenities rather than brand loyalty, impacting how sites are selected using navigation apps. With 33% of the city's charging spots dedicated to DC fast options, the balance between rapid and Level 2 charging caters to varying dwell times and enhances the city's overall charging appeal, making it an attractive hub for EV drivers traversing the region.

San Angelo charging by the numbers

Locations
12
Chargers
32
DC Fast locations
4
Level 2 locations
8

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.7. Average DC fast power: 138 kW.

San Angelo charging — local snapshot

Top operator share
ChargePoint Network runs 33% of public locations across 6 networks.
Average DC fast power
138 kW (fastest stall: 250 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 12 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in San Angelo

The following operators run public charging in San Angelo, ranked by number of locations.

Featured charging locations in San Angelo

A selection of higher-power public charging locations across San Angelo, sorted by power level.

  1. H-E-B Fuel - Tesla Supercharger — San Angelo, TX, 76901 (Tesla · DC Fast · 250 kW)
  2. Jim Bass Ford — San Angelo, TX, 76901 (FORD_CHARGE · DC Fast · 120 kW)
  3. GM - RANDALL MOTORS — San Angelo, TX, 76903 (EV Connect · DC Fast · 120 kW)
  4. Car Town Hyundai — San Angelo, TX, 76903 (Blink Network · DC Fast · 60 kW)
  5. Jim Bass Ford — San Angelo, TX, 76901 (Blink Network · Level 2 · 21.6 kW)
  6. KOSA STATION 1 — San Angelo, TX, 76901 (ChargePoint Network · Level 2 · 12 kW)
  7. Comfort Suites San Angelo near University — San Angelo, TX, 76901 (UNIVERSAL · Level 2 · 11.2 kW)
  8. Super 8 - San Angelo — San Angelo, TX, 76903 (UNIVERSAL · Level 2 · 11.2 kW)
  9. SMASHERS SMASHERS — San Angelo, TX, 76901 (ChargePoint Network · Level 2 · 9.6 kW)
  10. Jim Bass Nissan — San Angelo, TX, 76901 (Blink Network · Level 2 · 8.6 kW)
  11. AMERICINN STATION 1 — San Angelo, TX, 76901 (ChargePoint Network · Level 2 · 6.5 kW)
  12. ANGORIA-FRONT-1 ANGORIA FRONT 1 — San Angelo, TX, 76903 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For San Angelo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in San Angelo, Texas?
There are 12 public electric vehicle charging locations in San Angelo, Texas, with a combined 32 individual chargers. 4 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in San Angelo?
ChargePoint Network operates the most public charging locations in San Angelo with 4 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in San Angelo?
Level 2 EV chargers in San Angelo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in San Angelo?
Most San Angelo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in San Angelo?
A typical commercial Level 2 installation in San Angelo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in San Angelo take to become profitable?
Payback in San Angelo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage