Install EV Chargers in Kerrville, Texas

Install EV chargers or analyze a site in Kerrville, Texas. 12 existing public charging locations (3 DC fast, 9 Level 2). Free 0–100 profitability score on any Kerrville address from EV Data Map by Charge Rigs.

Kerrville, Texas is served by 12 public electric vehicle charging locations operating 24 individual chargers — an average of 2.0 chargers per site. Of those locations, 3 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Kerrville is ChargePoint Network with 11 locations, followed by FORD_CHARGE with 1. Average DC fast power across the city is approximately 113 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kerrville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Kerrville

Kerrville, Texas, showcases a concentrated charging infrastructure heavily dominated by the ChargePoint Network, accounting for 92% of its 12 public charging locations. With 25% of these sites featuring DC fast chargers, the average fast charging power stands at 113 kW, positioning Kerrville around the mid-range of national offerings. Notably, 33% of DC fast stations are 150 kW-class or higher, giving an edge to newer operators that can leverage faster hardware in this competitive market. This charging landscape suggests significant opportunities for site developers, particularly for those introducing higher-capacity charging options that appeal to drivers relying on navigation apps for optimal charging routes.

Kerrville charging by the numbers

Locations
12
Chargers
24
DC Fast locations
3
Level 2 locations
9

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 2.0. Average DC fast power: 113 kW.

Kerrville charging — local snapshot

Top operator share
ChargePoint Network runs 92% of public locations across 2 networks.
Average DC fast power
113 kW (fastest stall: 240 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 12 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Kerrville

The following operators run public charging in Kerrville, ranked by number of locations.

Featured charging locations in Kerrville

A selection of higher-power public charging locations across Kerrville, sorted by power level.

  1. Ken Stoepel Ford — Kerrville, TX, 78028 (FORD_CHARGE · DC Fast · 240 kW)
  2. KV MAIN CAMPUS KV RETAIL DC 2 — Kerrville, TX, 78028 (ChargePoint Network · DC Fast · 50 kW)
  3. KERRVILLE PUB VISITOR CENTER — Kerrville, TX, 78028 (ChargePoint Network · DC Fast · 50 kW)
  4. KV MAIN CAMPUS KV RETAIL L2 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  5. KERRVILLE PUB NATURE CNTR1 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  6. KERRVILLE PUB KERRVILLE GAR — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  7. KERRVILLE PUB PETERSON HOSPIT — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  8. KERRVILLE PUB ARTS MUSEUM 1 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  9. KERRVILLE PUB SCHREINER UNIV — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  10. GREENHILLS STATION #1 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  11. GREENHILLS STATION #2 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)
  12. GREENHILLS STATION #3 — Kerrville, TX, 78028 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Kerrville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Kerrville, Texas?
There are 12 public electric vehicle charging locations in Kerrville, Texas, with a combined 24 individual chargers. 3 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Kerrville?
ChargePoint Network operates the most public charging locations in Kerrville with 11 sites, followed by FORD_CHARGE with 1 sites.
How much does it cost to install an EV charger in Kerrville?
Level 2 EV chargers in Kerrville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Kerrville?
Most Kerrville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Kerrville?
A typical commercial Level 2 installation in Kerrville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Kerrville take to become profitable?
Payback in Kerrville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.