Install EV Chargers in Stafford, Texas

Install EV chargers or analyze a site in Stafford, Texas. 11 existing public charging locations (5 DC fast, 6 Level 2). Free 0–100 profitability score on any Stafford address from EV Data Map by Charge Rigs.

Stafford, Texas is served by 11 public electric vehicle charging locations operating 32 individual chargers — an average of 2.9 chargers per site. Of those locations, 5 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Stafford is ChargePoint Network with 4 locations, followed by UNIVERSAL with 1. Average DC fast power across the city is approximately 170 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Stafford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Stafford

Stafford, Texas, boasts a robust and diverse public charging infrastructure, with 11 locations supported by 8 distinct networks, creating a competitive landscape for EV drivers. The strong presence of DC fast chargers—45% of sites—averaging 170 kW, with 60% classified at 150 kW or higher, positions Stafford as a modern hub for fast charging needs. The highest-powered stall at 350 kW is notable, appealing to drivers seeking quick turnarounds. ChargePoint Network leads with a significant share of 36% of the charging sites, fostering a variety of options that enhance pricing and uptime. This rich mix of charging capabilities allows drivers to choose based on specific power needs and amenities, making Stafford an attractive market for EV infrastructure development.

Stafford charging by the numbers

Locations
11
Chargers
32
DC Fast locations
5
Level 2 locations
6

DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 2.9. Average DC fast power: 170 kW.

Stafford charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 8 networks.
Average DC fast power
170 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 11 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Stafford

The following operators run public charging in Stafford, ranked by number of locations.

Featured charging locations in Stafford

A selection of higher-power public charging locations across Stafford, sorted by power level.

  1. Walmart 915 (Stafford, TX) — Stafford, TX, 77477 (Electrify America · DC Fast · 350 kW)
  2. Helfman Ford — Stafford, TX, 77477 (FORD_CHARGE · DC Fast · 240 kW)
  3. 5 Star Shell Gas Station — Stafford, TX, 77477 (GRAVITI_ENERGY · DC Fast · 150 kW)
  4. EchoPark Stafford — Stafford, TX, 77477 (CHAEVI · DC Fast · 60 kW)
  5. Sterling McCall Nissan — Stafford, TX, 77477 (Non-Networked · DC Fast · 50 kW)
  6. Holiday Inn Express & Suites - Stafford NW Sugar Land — Stafford, TX, 77477 (UNIVERSAL · Level 2 · 7.2 kW)
  7. Home2 Suites By Hilton, Houston Stafford - Tesla Destination — Stafford, TX, 77477 (Tesla Destination · Level 2 · 7.2 kW)
  8. LENOXATTHEGRID TOWNHOME — Stafford, TX, 77477 (ChargePoint Network · Level 2 · 6.5 kW)
  9. LENOXATTHEGRID LEVEL3 — Stafford, TX, 77477 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LENOXATTHEGRID LEVEL4 — Stafford, TX, 77477 (ChargePoint Network · Level 2 · 6.5 kW)
  11. LENOXATTHEGRID LEVEL2 — Stafford, TX, 77477 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Stafford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Stafford, Texas?
There are 11 public electric vehicle charging locations in Stafford, Texas, with a combined 32 individual chargers. 5 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Stafford?
ChargePoint Network operates the most public charging locations in Stafford with 4 sites, followed by UNIVERSAL with 1 sites.
How much does it cost to install an EV charger in Stafford?
Level 2 EV chargers in Stafford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Stafford?
Most Stafford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Stafford?
A typical commercial Level 2 installation in Stafford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Stafford take to become profitable?
Payback in Stafford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage