Install EV Chargers in Roanoke, Virginia

Install EV chargers or analyze a site in Roanoke, Virginia. 29 existing public charging locations (8 DC fast, 21 Level 2). Free 0–100 profitability score on any Roanoke address from EV Data Map by Charge Rigs.

Roanoke, Virginia is served by 29 public electric vehicle charging locations operating 84 individual chargers — an average of 2.9 chargers per site. Of those locations, 8 (28%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (72%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Roanoke is ChargePoint Network with 8 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 138 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Roanoke and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Roanoke

Roanoke's public charging landscape stands out for its competitive mix and diverse operator base, featuring 13 distinct networks across 29 locations. This variety fosters a dynamic pricing structure and keeps service uptime high, allowing drivers to select charging sources based on specific power needs and amenities rather than sticking to a singular provider. With 28% of the sites offering DC fast charging, the average output of 138 kW—together with 38% of fast stations rated at 150 kW or above—positions the city favorably for both current and future EV drivers. This blend of options enhances the charging experience, particularly for those seeking higher power outputs to match their travel demands.

Roanoke charging by the numbers

Locations
29
Chargers
84
DC Fast locations
8
Level 2 locations
21

DC fast share: 28% of locations. Level 2 share: 72%. Average chargers per site: 2.9. Average DC fast power: 138 kW.

Roanoke charging — local snapshot

Top operator share
ChargePoint Network runs 28% of public locations across 13 networks.
Average DC fast power
138 kW (fastest stall: 300 kW)
High-power share
38% of DC fast sites are 150 kW-class or higher
Mix
28% DC fast / 72% Level 2 across 29 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Roanoke

The following operators run public charging in Roanoke, ranked by number of locations.

Featured charging locations in Roanoke

A selection of higher-power public charging locations across Roanoke, sorted by power level.

  1. Roanoke, VA — Roanoke, VA, 24014 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  2. Sheetz - Tesla Supercharger — Roanoke, VA, 24012 (Tesla · DC Fast · 250 kW)
  3. Berglund Chevrolet Buick — Roanoke, VA, 24012 (EV Connect · DC Fast · 180 kW)
  4. Magic City Ford Lincoln Roanoke - DCFC — Roanoke, VA, 24016 (Blink Network · DC Fast · 120 kW)
  5. Cave Spring Corners — Roanoke, VA, 24018 (eVgo Network · DC Fast · 100 kW)
  6. STHR HYUNDAI #1 — Roanoke, VA, 24019 (ChargePoint Network · DC Fast · 62.5 kW)
  7. City of Roanoke — Roanoke, VA, 24011 (Non-Networked · DC Fast · 50 kW)
  8. First Team Nissan — Roanoke, VA, 24019 (Non-Networked · DC Fast · 44 kW)
  9. SpringHill Suites by Marriott Roanoke North — Roanoke, VA, 24019 (UNIVERSAL · Level 2 · 11.2 kW)
  10. West End Flats — Roanoke, VA, 24016 (Non-Networked · Level 2 · 11 kW)
  11. Roanoke, VA - Ivy Market — Roanoke, VA, 24014 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  12. Virginia Museum of Transportation — Roanoke, VA, 24016 (Blink Network · Level 2 · 8.6 kW)

Nearby cities with EV charging coverage

Other cities in Virginia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Roanoke specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Roanoke, Virginia?
There are 29 public electric vehicle charging locations in Roanoke, Virginia, with a combined 84 individual chargers. 8 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Roanoke?
ChargePoint Network operates the most public charging locations in Roanoke with 8 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Roanoke?
Level 2 EV chargers in Roanoke typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Roanoke?
Most Roanoke projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Virginia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Roanoke?
A typical commercial Level 2 installation in Roanoke energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Roanoke take to become profitable?
Payback in Roanoke depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.