Install EV Chargers in Mount Vernon, Washington

Install EV chargers or analyze a site in Mount Vernon, Washington. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any Mount Vernon address from EV Data Map by Charge Rigs.

Mount Vernon, Washington is served by 11 public electric vehicle charging locations operating 105 individual chargers — an average of 9.5 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Mount Vernon is ChargePoint Network with 6 locations, followed by RED_E with 1. Average DC fast power across the city is approximately 294 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mount Vernon and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Mount Vernon

Mount Vernon boasts a competitive EV charging landscape with 11 public locations operated by six distinct networks, ensuring drivers have diverse choices tailored to their preferences. ChargePoint Network leads with over half of the sites, fostering competitive pricing and uptime. The city’s four DC fast charging locations distinctly average 294 kW, with three-quarters classified at 150 kW or higher, positioning Mount Vernon among the fastest charging environments in the region. This emphasis on higher power levels allows EV drivers to leverage superior charging speeds, particularly appealing for those using navigation apps that prioritize rapid charging options. Alongside the Level 2 infrastructure, this strategic mix supports both quick stopovers and longer-dwell needs, ensuring Mount Vernon meets a broad spectrum of electric vehicle charging demands.

Mount Vernon charging by the numbers

Locations
11
Chargers
105
DC Fast locations
4
Level 2 locations
7

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 9.5. Average DC fast power: 294 kW.

Mount Vernon charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 6 networks.
Average DC fast power
294 kW (fastest stall: 400 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 11 locations
Estimated DC ports
23 fast-charging ports city-wide

Charging networks in Mount Vernon

The following operators run public charging in Mount Vernon, ranked by number of locations.

Featured charging locations in Mount Vernon

A selection of higher-power public charging locations across Mount Vernon, sorted by power level.

  1. Mount Vernon, WA Rechargery Relay - S 5th St — Mount Vernon, WA, 98273 (IONNA · DC Fast · 400 kW)
  2. Riverside Lanes Mt Vernon — Mount Vernon, WA, 98273 (RED_E · DC Fast · 351 kW)
  3. Walmart 2596 (Mount Vernon, WA) — Mount Vernon, WA, 98273 (Electrify America · DC Fast · 350 kW)
  4. Mt Vernon Library Commons — Mount Vernon, WA, 98273 (CHARGELAB · DC Fast · 75 kW)
  5. County Commissioners Administrative Building — Mount Vernon, WA, 98273 (EV Connect · Level 2 · 9.6 kW)
  6. SKAGITYMCA THREE — Mount Vernon, WA, 98273 (ChargePoint Network · Level 2 · 6.5 kW)
  7. SKAGIT STATION SS1 — Mount Vernon, WA, 98273 (ChargePoint Network · Level 2 · 6.5 kW)
  8. SKAGITYMCA TWO — Mount Vernon, WA, 98273 (ChargePoint Network · Level 2 · 6.5 kW)
  9. SKAGITREGHEALTH MVSC — Mount Vernon, WA, 98274 (ChargePoint Network · Level 2 · 6.5 kW)
  10. SKAGIT STATION SS2 — Mount Vernon, WA, 98273 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SKAGITYMCA ONE — Mount Vernon, WA, 98273 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Mount Vernon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Mount Vernon, Washington?
There are 11 public electric vehicle charging locations in Mount Vernon, Washington, with a combined 105 individual chargers. 4 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Mount Vernon?
ChargePoint Network operates the most public charging locations in Mount Vernon with 6 sites, followed by RED_E with 1 sites.
How much does it cost to install an EV charger in Mount Vernon?
Level 2 EV chargers in Mount Vernon typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mount Vernon?
Most Mount Vernon projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mount Vernon?
A typical commercial Level 2 installation in Mount Vernon energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mount Vernon take to become profitable?
Payback in Mount Vernon depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.