Install EV chargers or analyze a site in Washougal, Washington. 14 existing public charging locations (1 DC fast, 13 Level 2). Free 0–100 profitability score on any Washougal address from EV Data Map by Charge Rigs.
Washougal, Washington is served by 14 public electric vehicle charging locations operating 23 individual chargers — an average of 1.6 chargers per site. Of those locations, 1 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Washougal is ChargePoint Network with 13 locations, followed by FORD_CHARGE with 1. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Washougal and receive an instant ROI score, demand projection, and recommended charger configuration.
Washougal, Washington, features a concentrated public charging network, with ChargePoint Network operating 93% of its 14 locations, highlighting a reliance on one provider. The city hosts only one DC fast charging site, averaging 120 kW, which positions it at a mid-level power tier compared to national standards. With no DC fast options reaching 150 kW or higher, new competitors could attract drivers seeking faster charging solutions. Given that a majority of the city’s charging infrastructure consists of Level 2 stations, drivers looking for rapid charging may find significant gaps in Washougal's network worth addressing, especially as nearby cities expand their offerings. Understanding this landscape can guide developers in optimizing their site selection and hardware investments.
DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 1.6. Average DC fast power: 120 kW.
The following operators run public charging in Washougal, ranked by number of locations.
A selection of higher-power public charging locations across Washougal, sorted by power level.
Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Washougal specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.