Install EV Chargers in Wenatchee, Washington

Install EV chargers or analyze a site in Wenatchee, Washington. 20 existing public charging locations (4 DC fast, 16 Level 2). Free 0–100 profitability score on any Wenatchee address from EV Data Map by Charge Rigs.

Wenatchee, Washington is served by 20 public electric vehicle charging locations operating 48 individual chargers — an average of 2.4 chargers per site. Of those locations, 4 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Wenatchee is ChargePoint Network with 9 locations, followed by Non-Networked with 7. Average DC fast power across the city is approximately 125 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wenatchee and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Wenatchee

Wenatchee offers a competitive and diverse public charging landscape with 20 locations spanning six distinct operators, ensuring that EV drivers have options tailored to their needs. ChargePoint Network dominates with 45% of the sites, allowing for varied pricing and uptime. The city’s 4 DC fast charging sites average 125 kW, with half capable of delivering 150 kW or more, providing a robust mid-power charging experience. This mix, complemented by 16 Level 2 chargers catering to longer dwell times, enhances the overall usability for EV drivers. As new entrants bring 150–350 kW hardware, they will strengthen Wenatchee’s charging appeal, making strategic site selection a key consideration for drivers seeking optimal power and amenities.

Wenatchee charging by the numbers

Locations
20
Chargers
48
DC Fast locations
4
Level 2 locations
16

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 2.4. Average DC fast power: 125 kW.

Wenatchee charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 6 networks.
Average DC fast power
125 kW (fastest stall: 180 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 20 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Wenatchee

The following operators run public charging in Wenatchee, ranked by number of locations.

Featured charging locations in Wenatchee

A selection of higher-power public charging locations across Wenatchee, sorted by power level.

  1. CircleK - Wenatchee, WA — Wenatchee, WA, 98801 (CIRCLE_K · DC Fast · 180 kW)
  2. WCEH Wenatchee — Wenatchee, WA, 98801 (EVCS · DC Fast · 175 kW)
  3. Community Services (DCFC) — Wenatchee, WA, 98801 (Blink Network · DC Fast · 120 kW)
  4. Cascade Chevrolet — Wenatchee, WA, 98801 (Non-Networked · DC Fast · 25 kW)
  5. Rocky Reach Dam Visitor Center — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 16 kW)
  6. Confluence Health - Mares Building — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 7.2 kW)
  7. Wenatchee Convention Center — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 7.2 kW)
  8. Confluence Health - Stanley Building — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 7.2 kW)
  9. Warm Springs Inn & Winery - Tesla Destination — Wenatchee, WA, 98801 (Tesla Destination · Level 2 · 7.2 kW)
  10. Confluence Health - Central Washington Hospital Parking Garage — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 7.2 kW)
  11. Confluence Health - Central Washington Hospital — Wenatchee, WA, 98801 (Non-Networked · Level 2 · 7.2 kW)
  12. CCPUD NO 1 15 — Wenatchee, WA, 98801 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Wenatchee specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Wenatchee, Washington?
There are 20 public electric vehicle charging locations in Wenatchee, Washington, with a combined 48 individual chargers. 4 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Wenatchee?
ChargePoint Network operates the most public charging locations in Wenatchee with 9 sites, followed by Non-Networked with 7 sites.
How much does it cost to install an EV charger in Wenatchee?
Level 2 EV chargers in Wenatchee typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wenatchee?
Most Wenatchee projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wenatchee?
A typical commercial Level 2 installation in Wenatchee energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wenatchee take to become profitable?
Payback in Wenatchee depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.