Install EV Chargers in Oconomowoc, Wisconsin

Install EV chargers or analyze a site in Oconomowoc, Wisconsin. 11 existing public charging locations (5 DC fast, 6 Level 2). Free 0–100 profitability score on any Oconomowoc address from EV Data Map by Charge Rigs.

Oconomowoc, Wisconsin is served by 11 public electric vehicle charging locations operating 22 individual chargers — an average of 2.0 chargers per site. Of those locations, 5 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oconomowoc is ChargePoint Network with 4 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 70 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oconomowoc and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oconomowoc

Oconomowoc boasts a competitive public EV charging landscape with a variety of 11 locations served by five distinct operators, primarily ChargePoint Network, which accounts for 36% of the offerings. This diversity fosters competitive pricing and reliability, attracting drivers to choose based on available power and amenities. The city features a solid average DC fast charging power of 70 kW, while the fastest station reaches 180 kW, with 20% of fast chargers classified at 150 kW or higher. This older fleet mix implies opportunities for newer, higher-capacity chargers, as local drivers prefer options that cater to their specific needs. With 45% of charging sites offering DC fast capabilities, Oconomowoc balances efficiency and convenience for both short and long dwell times.

Oconomowoc charging by the numbers

Locations
11
Chargers
22
DC Fast locations
5
Level 2 locations
6

DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 2.0. Average DC fast power: 70 kW.

Oconomowoc charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 5 networks.
Average DC fast power
70 kW (fastest stall: 180 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 11 locations
Estimated DC ports
7 fast-charging ports city-wide

Charging networks in Oconomowoc

The following operators run public charging in Oconomowoc, ranked by number of locations.

Featured charging locations in Oconomowoc

A selection of higher-power public charging locations across Oconomowoc, sorted by power level.

  1. Ewald – Chrysler Jeep Ram – Oconomowoc WI - DCFC — Oconomowoc, WI, 53066 (Blink Network · DC Fast · 180 kW)
  2. HYUNDAI OF LC WEST LOT — Oconomowoc, WI, 53066 (ChargePoint Network · DC Fast · 62.5 kW)
  3. 36833 E Wisconsin Ave — Oconomowoc, WI, 53066 (EV Connect · DC Fast · 50 kW)
  4. HYUNDAI OF LC SOUTH CP — Oconomowoc, WI, 53066 (ChargePoint Network · DC Fast · 31 kW)
  5. EWALD MOTORS ABB STATION 1 — Oconomowoc, WI, 53066 (ChargePoint Network · DC Fast · 24 kW)
  6. Ewald – Chrysler Jeep Ram – Oconomowoc WI - Show Room — Oconomowoc, WI, 53066 (Blink Network · Level 2 · 21.6 kW)
  7. Nissan Lake Country — Oconomowoc, WI, 53066 (SYNERGEV · Level 2 · 19 kW)
  8. Ewald – Chrysler Jeep Ram – Oconomowoc WI — Oconomowoc, WI, 53066 (Blink Network · Level 2 · 16.6 kW)
  9. The Locklyn At Olympia Fields — Oconomowoc, WI, 53066 (Blink Network · Level 2 · 8.7 kW)
  10. Sendik's Food Market - Tesla Destination — Oconomowoc, WI, 53066 (Tesla Destination · Level 2 · 7.2 kW)
  11. KHC TPS CHARGER — Oconomowoc, WI, 53066 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oconomowoc specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oconomowoc, Wisconsin?
There are 11 public electric vehicle charging locations in Oconomowoc, Wisconsin, with a combined 22 individual chargers. 5 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Oconomowoc?
ChargePoint Network operates the most public charging locations in Oconomowoc with 4 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Oconomowoc?
Level 2 EV chargers in Oconomowoc typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oconomowoc?
Most Oconomowoc projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oconomowoc?
A typical commercial Level 2 installation in Oconomowoc energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oconomowoc take to become profitable?
Payback in Oconomowoc depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.