Install EV Chargers in Glendale, Wisconsin

Install EV chargers or analyze a site in Glendale, Wisconsin. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Glendale address from EV Data Map by Charge Rigs.

Glendale, Wisconsin is served by 11 public electric vehicle charging locations operating 42 individual chargers — an average of 3.8 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Glendale is ChargePoint Network with 6 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Glendale and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Glendale

Glendale, Wisconsin, offers a remarkably diverse public charging landscape with 11 locations, including three DC fast chargers that average an impressive 151 kW, reflecting a modern approach to EV infrastructure. With 67% of these fast charging sites rated at 150 kW or higher, drivers benefit from rapid charging options, particularly with the fastest stall peaking at 250 kW. The presence of five distinct charging networks, led predominantly by ChargePoint Network with 55% of the sites, ensures competitive pricing and uptime while inviting drivers to choose based on power and amenities. This mix of DC fast and Level 2 options uniquely positions Glendale as a strategic hub for EV adoption in the region, appealing to users looking for efficiency and flexibility on their journeys.

Glendale charging by the numbers

Locations
11
Chargers
42
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.8. Average DC fast power: 151 kW.

Glendale charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 5 networks.
Average DC fast power
151 kW (fastest stall: 250 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Glendale

The following operators run public charging in Glendale, ranked by number of locations.

Featured charging locations in Glendale

A selection of higher-power public charging locations across Glendale, sorted by power level.

  1. Bayshore Town Center - Tesla Supercharger — Glendale, WI, 53217 (Tesla · DC Fast · 250 kW)
  2. Heiser Ford - DCFC — Glendale, WI, 53209 (Blink Network · DC Fast · 180 kW)
  3. BMW of Milwaukee North — Glendale, WI, 53209 (ABM · DC Fast · 24 kW)
  4. Heiser Ford - Level 2 — Glendale, WI, 53209 (Blink Network · Level 2 · 21.6 kW)
  5. Hampton Inn Glendale Milwaukee — Glendale, WI, 53217 (EV Connect · Level 2 · 7.4 kW)
  6. LUPIENT EV LUPIENT 6030 — Glendale, WI, 53209 (ChargePoint Network · Level 2 · 6.5 kW)
  7. LEXUS MILWAUKEE CT4023 #2 — Glendale, WI, 53209 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MERCEDES SALES MILWAUKEE N. — Glendale, WI, 53209 (ChargePoint Network · Level 2 · 6.5 kW)
  9. AMPCAP 0089 BAYSHORE 2 — Glendale, WI, 53217 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AMPCAP 0089 BAYSHORE 1 — Glendale, WI, 53217 (ChargePoint Network · Level 2 · 6.5 kW)
  11. LEXUS MILWAUKEE CT4023 #1 — Glendale, WI, 53209 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Glendale specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Glendale, Wisconsin?
There are 11 public electric vehicle charging locations in Glendale, Wisconsin, with a combined 42 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Glendale?
ChargePoint Network operates the most public charging locations in Glendale with 6 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Glendale?
Level 2 EV chargers in Glendale typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Glendale?
Most Glendale projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Glendale?
A typical commercial Level 2 installation in Glendale energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Glendale take to become profitable?
Payback in Glendale depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage