Install EV Chargers in Oak Creek, Wisconsin

Install EV chargers or analyze a site in Oak Creek, Wisconsin. 20 existing public charging locations (2 DC fast, 18 Level 2). Free 0–100 profitability score on any Oak Creek address from EV Data Map by Charge Rigs.

Oak Creek, Wisconsin is served by 20 public electric vehicle charging locations operating 48 individual chargers — an average of 2.4 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oak Creek is ChargePoint Network with 12 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oak Creek and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oak Creek

In Oak Creek, Wisconsin, the public EV charging landscape is notably shaped by ChargePoint Network, which operates 60% of the 20 charging locations, including all 2 DC fast chargers. This concentration translates into consistent service and pricing structures, making it a key consideration for new operators entering the market. With an impressive average power of 150 kW at the DC fast locations, Oak Creek offers drivers a competitive charging experience that rivals other nearby cities. Notably, the entire DC fast infrastructure maintains a high standard, ensuring users benefit from a modern charging solution. The city's mix of 10% DC fast chargers and 90% Level 2 options underscores a balance of quick power and longer-duration charging possibilities to cater to diverse driver needs.

Oak Creek charging by the numbers

Locations
20
Chargers
48
DC Fast locations
2
Level 2 locations
18

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 2.4. Average DC fast power: 150 kW.

Oak Creek charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 6 networks.
Average DC fast power
150 kW (fastest stall: 150 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 20 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Oak Creek

The following operators run public charging in Oak Creek, ranked by number of locations.

Featured charging locations in Oak Creek

A selection of higher-power public charging locations across Oak Creek, sorted by power level.

  1. Meijer 283 (Oak Creek, WI) — Oak Creek, WI, 53154 (Electrify America · DC Fast · 150 kW)
  2. Meijer - Tesla Supercharger — Oak Creek, WI, 53154 (Tesla · DC Fast · 150 kW)
  3. Avid Hotel Oak Creek — Oak Creek, WI, 53154 (TURNONGREEN · Level 2 · 11.5 kW)
  4. Avid Hotel Oak Creek — Oak Creek, WI, 53154 (TURNONGREEN · Level 2 · 11 kW)
  5. Broadacre Building C — Oak Creek, WI, 53154 (Blink Network · Level 2 · 10.4 kW)
  6. MKEOK - TownePlace Suites Oak Creek — Oak Creek, WI, 53154 (EV Connect · Level 2 · 9.6 kW)
  7. DECKER OAKSA1 STATION 1 — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 7.7 kW)
  8. DECKER OAKSA1 STATION 6 — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 7.7 kW)
  9. DECKER OAKSA1 STATION 2 — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 7.7 kW)
  10. DECKER OAKSA1 STATION 3 A2-SP — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 7.7 kW)
  11. BACK 1 HOMEWOOD #2 — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 6.5 kW)
  12. IKEA USA OAK CREEK 2 — Oak Creek, WI, 53154 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oak Creek specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oak Creek, Wisconsin?
There are 20 public electric vehicle charging locations in Oak Creek, Wisconsin, with a combined 48 individual chargers. 2 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Oak Creek?
ChargePoint Network operates the most public charging locations in Oak Creek with 12 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Oak Creek?
Level 2 EV chargers in Oak Creek typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oak Creek?
Most Oak Creek projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oak Creek?
A typical commercial Level 2 installation in Oak Creek energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oak Creek take to become profitable?
Payback in Oak Creek depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.