Install EV Chargers in Janesville, Wisconsin

Install EV chargers or analyze a site in Janesville, Wisconsin. 18 existing public charging locations (7 DC fast, 11 Level 2). Free 0–100 profitability score on any Janesville address from EV Data Map by Charge Rigs.

Janesville, Wisconsin is served by 18 public electric vehicle charging locations operating 64 individual chargers — an average of 3.6 chargers per site. Of those locations, 7 (39%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (61%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Janesville is ChargePoint Network with 12 locations, followed by SYNERGEV with 2. Average DC fast power across the city is approximately 179 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Janesville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Janesville

Public charging in Janesville, Wisconsin is dominated by ChargePoint Network, which runs 67% of the 18 public locations across the city. That concentration means uptime, pricing and network reliability hinge heavily on a single operator — a fact worth weighing when you plan a competing site. The 7 DC fast locations average 179 kW, with the fastest site at 400 kW. That is a modern high-power fleet by current US standards; 57% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 39% of Janesville's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 40 DC fast ports across the city. EV Data Map scores any Janesville address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Janesville charging by the numbers

Locations
18
Chargers
64
DC Fast locations
7
Level 2 locations
11

DC fast share: 39% of locations. Level 2 share: 61%. Average chargers per site: 3.6. Average DC fast power: 179 kW.

Janesville charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 6 networks.
Average DC fast power
179 kW (fastest stall: 400 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
39% DC fast / 61% Level 2 across 18 locations
Estimated DC ports
40 fast-charging ports city-wide

Charging networks in Janesville

The following operators run public charging in Janesville, ranked by number of locations.

Featured charging locations in Janesville

A selection of higher-power public charging locations across Janesville, sorted by power level.

  1. Janesville, WI Rechargery Relay - Morse St — Janesville, WI, 53545 (IONNA · DC Fast · 400 kW)
  2. Woodman's Food Market - Tesla Supercharger — Janesville, WI, 53545 (Tesla · DC Fast · 250 kW)
  3. Frank Boucher Chrysler Dodge Jeep Ram — Janesville, WI, 53545 (SYNERGEV · DC Fast · 180 kW)
  4. 2500 Humes Rd — Janesville, WI, 53545 (CHARGELAB · DC Fast · 180 kW)
  5. Gordie Boucher Ford of Janesville — Janesville, WI, 53545 (SYNERGEV · DC Fast · 120 kW)
  6. JH LEVEL 2 SHOWROOM — Janesville, WI, 53546 (ChargePoint Network · DC Fast · 62.5 kW)
  7. JH LEVEL 2 SERVICE — Janesville, WI, 53546 (ChargePoint Network · DC Fast · 62.5 kW)
  8. HESSER TOYOTA CPF50 LVL2 — Janesville, WI, 53545 (ChargePoint Network · Level 2 · 12 kW)
  9. TRU by Hilton — Janesville, WI, 53545 (Blink Network · Level 2 · 10.4 kW)
  10. WOODMANS CENTER #2 — Janesville, WI, 53545 (ChargePoint Network · Level 2 · 6.5 kW)
  11. WOODMAN'S JANESVILLE 1 — Janesville, WI, 53545 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WOODMANS CENTER #1 — Janesville, WI, 53545 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Janesville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Janesville, Wisconsin?
There are 18 public electric vehicle charging locations in Janesville, Wisconsin, with a combined 64 individual chargers. 7 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Janesville?
ChargePoint Network operates the most public charging locations in Janesville with 12 sites, followed by SYNERGEV with 2 sites.
How much does it cost to install an EV charger in Janesville?
Level 2 EV chargers in Janesville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Janesville?
Most Janesville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Janesville?
A typical commercial Level 2 installation in Janesville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Janesville take to become profitable?
Payback in Janesville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage