Install EV chargers or analyze a site in Janesville, Wisconsin. 18 existing public charging locations (7 DC fast, 11 Level 2). Free 0–100 profitability score on any Janesville address from EV Data Map by Charge Rigs.
Janesville, Wisconsin is served by 18 public electric vehicle charging locations operating 64 individual chargers — an average of 3.6 chargers per site. Of those locations, 7 (39%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (61%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Janesville is ChargePoint Network with 12 locations, followed by SYNERGEV with 2. Average DC fast power across the city is approximately 179 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Janesville and receive an instant ROI score, demand projection, and recommended charger configuration.
In Janesville, Wisconsin, the landscape of public EV charging is notably shaped by ChargePoint Network, which dominates the market with 67% of the city's 18 public charging locations. This concentration presents both opportunities and challenges for new operators, as network reliability and pricing are tightly linked to a single provider. The city’s infrastructure is robust, featuring 7 DC fast charging sites with an impressive average power of 179 kW, including one stall capable of delivering up to 400 kW. With over half of these fast chargers classified as 150 kW or higher, competitors entering this market will need to position their offerings in line with local demand for high-power solutions, especially in a city where nearly 40% of public chargers support quick turnaround for EV drivers.
DC fast share: 39% of locations. Level 2 share: 61%. Average chargers per site: 3.6. Average DC fast power: 179 kW.
The following operators run public charging in Janesville, ranked by number of locations.
A selection of higher-power public charging locations across Janesville, sorted by power level.
Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Janesville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.