Install EV chargers or analyze a site in Janesville, Wisconsin. 18 existing public charging locations (7 DC fast, 11 Level 2). Free 0–100 profitability score on any Janesville address from EV Data Map by Charge Rigs.
Janesville, Wisconsin is served by 18 public electric vehicle charging locations operating 64 individual chargers — an average of 3.6 chargers per site. Of those locations, 7 (39%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (61%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Janesville is ChargePoint Network with 12 locations, followed by SYNERGEV with 2. Average DC fast power across the city is approximately 179 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Janesville and receive an instant ROI score, demand projection, and recommended charger configuration.
Janesville, Wisconsin, features a robust charging infrastructure with a significant focus on DC fast charging, which constitutes 39% of its 18 public charging locations. ChargePoint Network dominates the landscape, operating 67% of these sites and ensuring high uptime and reliability, critical factors for potential developers or operators. With an average DC fast charging power of 179 kW and 57% of these fast sites rated 150 kW or higher, Janesville presents a compelling opportunity for those looking to invest in high-power charging solutions. Competitors will need to consider the presence of modern, fast charging options, including a peak stall at 400 kW, to meet driver expectations in a market primed for premium charging experiences.
DC fast share: 39% of locations. Level 2 share: 61%. Average chargers per site: 3.6. Average DC fast power: 179 kW.
The following operators run public charging in Janesville, ranked by number of locations.
A selection of higher-power public charging locations across Janesville, sorted by power level.
Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Janesville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.