Install EV Chargers in Conway, Arkansas

Install EV chargers or analyze a site in Conway, Arkansas. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Conway address from EV Data Map by Charge Rigs.

Conway, Arkansas is served by 16 public electric vehicle charging locations operating 61 individual chargers — an average of 3.8 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Conway is ChargePoint Network with 6 locations, followed by Tesla Destination with 5. Average DC fast power across the city is approximately 144 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Conway and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Conway

Conway stands out in the EV charging landscape with a diverse mix of seven distinct networks across its 16 public charging locations, led by ChargePoint Network, which operates 38% of these sites. This variety fosters competitive pricing and uptime while enabling drivers to select chargers based on power capabilities and amenities rather than being tied to a single brand. The city features three DC fast charging locations that average 144 kW, with one site offering a peak of 250 kW, ensuring that EV drivers can access robust charging options. With a third of fast charging sites classified as 150 kW or higher, Conway is strategically positioned to attract both everyday commuters and long-distance travelers, enhancing its appeal within the regional charging network.

Conway charging by the numbers

Locations
16
Chargers
61
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.8. Average DC fast power: 144 kW.

Conway charging — local snapshot

Top operator share
ChargePoint Network runs 38% of public locations across 7 networks.
Average DC fast power
144 kW (fastest stall: 250 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
17 fast-charging ports city-wide

Charging networks in Conway

The following operators run public charging in Conway, ranked by number of locations.

Featured charging locations in Conway

A selection of higher-power public charging locations across Conway, sorted by power level.

  1. Lewis Plaza - Tesla Supercharger — Conway, AR, 72032 (Tesla · DC Fast · 250 kW)
  2. Smith Ford — Conway, AR, 72032 (FORD_CHARGE · DC Fast · 120 kW)
  3. CRAINHYUNDAICON SOUTHEAST — Conway, AR, 72032 (ChargePoint Network · DC Fast · 62.5 kW)
  4. UCA STATIONS WINDGATE 2 — Conway, AR, 72035 (ChargePoint Network · Level 2 · 12 kW)
  5. UCA STATIONS WINDGATE 1 — Conway, AR, 72034 (ChargePoint Network · Level 2 · 12 kW)
  6. Stay-N-Charge EV Charging Station - Country Inn & Suites, Conway AR — Conway, AR, 72032 (STAY_N_CHARGE · Level 2 · 11.5 kW)
  7. 901 S Salem Rd — Conway, AR, 72034 (EV Connect · Level 2 · 11.5 kW)
  8. Superior Chevrolet Conway — Conway, AR, 72032 (Non-Networked · Level 2 · 10 kW)
  9. Candlewood Suites Conway - Tesla Destination — Conway, AR, 72032 (Tesla Destination · Level 2 · 7.2 kW)
  10. University of Central Arkansas Windgate Center - Tesla Destination — Conway, AR, 72035 (Tesla Destination · Level 2 · 7.2 kW)
  11. Comfort Inn & Suites Conway - Tesla Destination — Conway, AR, 72032 (Tesla Destination · Level 2 · 7.2 kW)
  12. Comfort Suites Conway - Tesla Destination — Conway, AR, 72032 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Arkansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Conway specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Conway, Arkansas?
There are 16 public electric vehicle charging locations in Conway, Arkansas, with a combined 61 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Conway?
ChargePoint Network operates the most public charging locations in Conway with 6 sites, followed by Tesla Destination with 5 sites.
How much does it cost to install an EV charger in Conway?
Level 2 EV chargers in Conway typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Conway?
Most Conway projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arkansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Conway?
A typical commercial Level 2 installation in Conway energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Conway take to become profitable?
Payback in Conway depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.