Install EV Chargers in Rogers, Arkansas

Install EV chargers or analyze a site in Rogers, Arkansas. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Rogers address from EV Data Map by Charge Rigs.

Rogers, Arkansas is served by 11 public electric vehicle charging locations operating 30 individual chargers — an average of 2.7 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Rogers is ChargePoint Network with 4 locations, followed by Tesla Destination with 1. Average DC fast power across the city is approximately 358 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Rogers and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Rogers

Rogers, Arkansas boasts a dynamic public charging infrastructure, featuring 11 locations operated by 8 distinct networks, with ChargePoint Network leading the way at 36%. This variety fosters a competitive environment where pricing and uptime thrive, allowing drivers to select charging options based on power output and amenities rather than being limited to one brand. Notably, the city’s 3 DC fast charging stations average an impressive power output of 358 kW, with the fastest stall hitting 400 kW, positioning Rogers at the forefront of ultra-fast charging options. With 27% of public sites dedicated to DC fast charging and a total of approximately 16 DC fast ports available, drivers can efficiently meet their charging needs while navigating the local grid landscape.

Rogers charging by the numbers

Locations
11
Chargers
30
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.7. Average DC fast power: 358 kW.

Rogers charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 8 networks.
Average DC fast power
358 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Rogers

The following operators run public charging in Rogers, ranked by number of locations.

Featured charging locations in Rogers

A selection of higher-power public charging locations across Rogers, sorted by power level.

  1. Walmart EV Charging — Rogers, AR, 72758 (WALMART · DC Fast · 400 kW)
  2. Walmart 5260 (Rogers, AR) — Rogers, AR, 72758 (Electrify America · DC Fast · 350 kW)
  3. Scottsdale Center - Tesla Supercharger — Rogers, AR, 72756 (Tesla · DC Fast · 325 kW)
  4. Stay-N-Charge EV Charging Station - Homewood Suites by Hilton Bentonville-Rogers — Rogers, AR, 72756 (STAY_N_CHARGE · Level 2 · 11.5 kW)
  5. Ozark Collaborative - Tesla Destination — Rogers, AR, 72756 (Tesla Destination · Level 2 · 7.2 kW)
  6. Natural State Beer Co — Rogers, AR, 72758 (Non-Networked · Level 2 · 7.2 kW)
  7. The Bend on Promenade-Site — Rogers, AR, 72758 (NOODOE · Level 2 · 7 kW)
  8. OBE EMBASSY ROGER R — Rogers, AR, 72758 (ChargePoint Network · Level 2 · 6.5 kW)
  9. DOWNTOWN HUB STATION #1 — Rogers, AR, 72756 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OBE EMBASSY ROGER L — Rogers, AR, 72758 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FMGI WALMART #5837-1 — Rogers, AR, 72758 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Arkansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Rogers specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Rogers, Arkansas?
There are 11 public electric vehicle charging locations in Rogers, Arkansas, with a combined 30 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Rogers?
ChargePoint Network operates the most public charging locations in Rogers with 4 sites, followed by Tesla Destination with 1 sites.
How much does it cost to install an EV charger in Rogers?
Level 2 EV chargers in Rogers typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Rogers?
Most Rogers projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arkansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Rogers?
A typical commercial Level 2 installation in Rogers energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Rogers take to become profitable?
Payback in Rogers depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.