Install EV Chargers in Fayetteville, Arkansas

Install EV chargers or analyze a site in Fayetteville, Arkansas. 28 existing public charging locations (1 DC fast, 27 Level 2). Free 0–100 profitability score on any Fayetteville address from EV Data Map by Charge Rigs.

Fayetteville, Arkansas is served by 28 public electric vehicle charging locations operating 92 individual chargers — an average of 3.3 chargers per site. Of those locations, 1 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fayetteville is ChargePoint Network with 14 locations, followed by Blink Network with 9. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fayetteville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fayetteville

Fayetteville, Arkansas offers a balanced EV charging landscape with 28 public locations across four distinct networks, primarily featuring ChargePoint Network, which operates half of these sites. Notably, the city boasts a single DC fast charging station delivering an impressive average power of 180 kW, ensuring that users have access to modern high-speed options. This facility represents a significant asset for drivers prioritizing quick charges, especially with the entire DC fast infrastructure categorized at 150 kW or higher. While only 4% of Fayetteville's charging spots are fast chargers, the remaining Level 2 stations cater to longer dwell times, highlighting a diverse range of charging solutions for both commuters and visitors in the area.

Fayetteville charging by the numbers

Locations
28
Chargers
92
DC Fast locations
1
Level 2 locations
27

DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 3.3. Average DC fast power: 180 kW.

Fayetteville charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 4 networks.
Average DC fast power
180 kW (fastest stall: 180 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
4% DC fast / 96% Level 2 across 28 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Fayetteville

The following operators run public charging in Fayetteville, ranked by number of locations.

Featured charging locations in Fayetteville

A selection of higher-power public charging locations across Fayetteville, sorted by power level.

  1. Lewis Automotive — Fayetteville, AR, 72704 (NOODOE · DC Fast · 180 kW)
  2. Lewis CDJR — Fayetteville, AR, 72704 (Blink Network · Level 2 · 16.6 kW)
  3. Lewis Ford Sales — Fayetteville, AR, 72703 (Blink Network · Level 2 · 16.6 kW)
  4. Uptown Fayetteville, LP - Parking Lot Island — Fayetteville, AR, 72704 (Blink Network · Level 2 · 13.5 kW)
  5. City of Fayetteville - Downtown Parking Deck — Fayetteville, AR, 72701 (Blink Network · Level 2 · 13 kW)
  6. Parking Deck - Spring Street — Fayetteville, AR, 72701 (Blink Network · Level 2 · 10.8 kW)
  7. Parking - Meadow Street Municiple Deck — Fayetteville, AR, 72701 (Blink Network · Level 2 · 10.8 kW)
  8. Parking - Center St Lot — Fayetteville, AR, 72701 (Blink Network · Level 2 · 10.8 kW)
  9. Axis on Futrall — Fayetteville, AR, 72701 (NOODOE · Level 2 · 10 kW)
  10. Dickson Street Parking — Fayetteville, AR, 72701 (Non-Networked · Level 2 · 9.6 kW)
  11. South Parking Lot - Blair Library — Fayetteville, AR, 72701 (Blink Network · Level 2 · 8.5 kW)
  12. Fayetteville Town Center — Fayetteville, AR, 72701 (Blink Network · Level 2 · 8.3 kW)

Nearby cities with EV charging coverage

Other cities in Arkansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fayetteville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fayetteville, Arkansas?
There are 28 public electric vehicle charging locations in Fayetteville, Arkansas, with a combined 92 individual chargers. 1 locations offer DC fast charging and 27 provide Level 2 charging.
What is the largest EV charging network in Fayetteville?
ChargePoint Network operates the most public charging locations in Fayetteville with 14 sites, followed by Blink Network with 9 sites.
How much does it cost to install an EV charger in Fayetteville?
Level 2 EV chargers in Fayetteville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fayetteville?
Most Fayetteville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arkansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fayetteville?
A typical commercial Level 2 installation in Fayetteville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fayetteville take to become profitable?
Payback in Fayetteville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.