Install EV chargers or analyze a site in Hot Springs, Arkansas. 19 existing public charging locations (4 DC fast, 15 Level 2). Free 0–100 profitability score on any Hot Springs address from EV Data Map by Charge Rigs.
Hot Springs, Arkansas is served by 19 public electric vehicle charging locations operating 59 individual chargers — an average of 3.1 chargers per site. Of those locations, 4 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Hot Springs is Blink Network with 6 locations, followed by ChargePoint Network with 5. Average DC fast power across the city is approximately 91 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Hot Springs and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Hot Springs
Hot Springs stands out in the EV charging landscape with its diverse offering of 19 public locations spanning 6 distinct networks, led by Blink Network at 32% of the sites. This variety fosters competitive pricing and reliability, allowing drivers to choose based on power and amenities rather than being tied to a single network. The city's DC fast charging stations average 91 kW, with a peak of 125 kW available, showcasing an older generation of technology that may influence driver preferences for newer, high-capacity options exceeding 150 kW. With 21% of its charging points dedicated to fast charging, Hot Springs serves both rapid and longer-dwell charging needs, making it a unique stop for EV users.
Hot Springs charging by the numbers
Locations
19
Chargers
59
DC Fast locations
4
Level 2 locations
15
DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.1. Average DC fast power: 91 kW.
Hot Springs charging — local snapshot
Top operator share
Blink Network runs 32% of public locations across 6 networks.
Average DC fast power
91 kW (fastest stall: 125 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 19 locations
Estimated DC ports
5 fast-charging ports city-wide
Charging networks in Hot Springs
The following operators run public charging in Hot Springs, ranked by number of locations.
Blink Network — 6 locations
ChargePoint Network — 5 locations
Tesla Destination — 4 locations
Non-Networked — 2 locations
NOODOE — 1 location
EV Connect — 1 location
Featured charging locations in Hot Springs
A selection of higher-power public charging locations across Hot Springs, sorted by power level.
FRANKLINS 3-4 FRANKLIN HS1 — Hot Springs, AR, 71901 (ChargePoint Network · DC Fast · 125 kW)
FRANKLINS 3-4 FRANKLIN HS2 — Hot Springs, AR, 71901 (ChargePoint Network · DC Fast · 125 kW)
ZAP HELIOS ZAP LLC — Hot Springs, AR, 71901 (ChargePoint Network · DC Fast · 62.5 kW)
Gregg Orr Cadillac Of Hot Springs — Hot Springs, AR, 71913 (EV Connect · DC Fast · 50 kW)
Home 2 Suites by Hilton Hot Springs — Hot Springs, AR, 71913 (Blink Network · Level 2 · 21.6 kW)
Hampton Inn Hot Springs — Hot Springs, AR, 71913 (Blink Network · Level 2 · 21.6 kW)
La Quinta Inn & Suites by Wyndham Hot Springs — Hot Springs, AR, 71913 (Blink Network · Level 2 · 21.6 kW)
Baymont by Wyndham Hot Springs On the Lake — Hot Springs, AR, 71913 (Blink Network · Level 2 · 21.6 kW)
TownePlace Suites by Marriott Hot Springs — Hot Springs, AR, 71913 (Blink Network · Level 2 · 21.6 kW)
Courtyard by Marriott Hot Springs — Hot Springs, AR, 71913 (Blink Network · Level 2 · 17.1 kW)
The Hotel Hot Springs and Spa - Tesla Destination — Hot Springs, AR, 71901 (Tesla Destination · Level 2 · 7.2 kW)
City of Hot Springs - Tesla Destination — Hot Springs, AR, 71901 (Tesla Destination · Level 2 · 7.2 kW)
Nearby cities with EV charging coverage
Other cities in Arkansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Hot Springs specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Hot Springs, Arkansas?
There are 19 public electric vehicle charging locations in Hot Springs, Arkansas, with a combined 59 individual chargers. 4 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Hot Springs?
Blink Network operates the most public charging locations in Hot Springs with 6 sites, followed by ChargePoint Network with 5 sites.
How much does it cost to install an EV charger in Hot Springs?
Level 2 EV chargers in Hot Springs typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Hot Springs?
Most Hot Springs projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arkansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Hot Springs?
A typical commercial Level 2 installation in Hot Springs energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Hot Springs take to become profitable?
Payback in Hot Springs depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.