Install EV chargers or analyze a site in Antioch, California. 15 existing public charging locations (6 DC fast, 9 Level 2). Free 0–100 profitability score on any Antioch address from EV Data Map by Charge Rigs.

Antioch, California is served by 15 public electric vehicle charging locations operating 59 individual chargers — an average of 3.9 chargers per site. Of those locations, 6 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Antioch is ChargePoint Network with 9 locations, followed by eVgo Network with 3. Average DC fast power across the city is approximately 238 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Antioch and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Antioch

Antioch, California stands out for its robust public charging infrastructure, with a strong emphasis on fast charging options. The city features six DC fast charging locations that average 238 kW, positioning them well above national standards, with the fastest available at 350 kW. Notably, 83% of these DC fast stations are classified as 150 kW or higher, catering to the demand for ultra-fast charging. Dominated by ChargePoint Network, which operates 60% of the sites, the reliability and pricing dynamics significantly depend on this major player. As 40% of Antioch's public charging locations are dedicated to DC fast charging, new entrants can efficiently target this high-demand segment by offering competitive power levels tailored for EV drivers navigating in the area.

Antioch charging by the numbers

Locations
15
Chargers
59
DC Fast locations
6
Level 2 locations
9

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 3.9. Average DC fast power: 238 kW.

Antioch charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 5 networks.
Average DC fast power
238 kW (fastest stall: 350 kW)
High-power share
83% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 15 locations
Estimated DC ports
41 fast-charging ports city-wide

Charging networks in Antioch

The following operators run public charging in Antioch, ranked by number of locations.

Featured charging locations in Antioch

A selection of higher-power public charging locations across Antioch, sorted by power level.

  1. Terrace Shopping Center — Antioch, CA, 94509 (eVgo Network · DC Fast · 350 kW)
  2. Somersville Towne Center — Antioch, CA, 94509 (eVgo Network · DC Fast · 350 kW)
  3. Empire Shopping Center — Antioch, CA, 94531 (eVgo Network · DC Fast · 350 kW)
  4. ARCO, W 10th St, Antioch, CA — Antioch, CA, 94509 (BP_PULSE · DC Fast · 180 kW)
  5. Target - Tesla Supercharger — Antioch, CA, 94531 (Tesla · DC Fast · 150 kW)
  6. Antioch Nissan — Antioch, CA, 94509 (Non-Networked · DC Fast · 50 kW)
  7. TOYOTA_SALES CT4K 1 — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)
  8. SDMC AUX STN SDMC #4 — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)
  9. SDMC AUX STN SDMC #3 — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)
  10. SDMC AUX STN SDMC AUX STN — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SDMC AUX STN SDMC #2 — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY HALL 1 CITY HALL 1 — Antioch, CA, 94509 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Antioch specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Antioch, California?
There are 15 public electric vehicle charging locations in Antioch, California, with a combined 59 individual chargers. 6 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Antioch?
ChargePoint Network operates the most public charging locations in Antioch with 9 sites, followed by eVgo Network with 3 sites.
How much does it cost to install an EV charger in Antioch?
Level 2 EV chargers in Antioch typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Antioch?
Most Antioch projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Antioch?
A typical commercial Level 2 installation in Antioch energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Antioch take to become profitable?
Payback in Antioch depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage