Install EV Chargers in Brentwood, California

Install EV chargers or analyze a site in Brentwood, California. 31 existing public charging locations (4 DC fast, 27 Level 2). Free 0–100 profitability score on any Brentwood address from EV Data Map by Charge Rigs.

Brentwood, California is served by 31 public electric vehicle charging locations operating 99 individual chargers — an average of 3.2 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Brentwood is ChargePoint Network with 23 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 268 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Brentwood and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Brentwood

Brentwood, California offers a compelling public charging landscape, primarily shaped by ChargePoint Network, which operates 74% of the 31 available locations. While 13% of these are DC fast chargers, they boast an impressive average power output of 268 kW, with most fast chargers rated at 150 kW and above, making them highly attractive for EV drivers. This concentration on DC fast charging enhances the potential for uptime and reliability but also creates a competitive edge for new operators focusing on similar high-capacity installations. With 36 DC fast ports strategically spread throughout the city, Brentwood presents a unique opportunity for site developers to effectively address local charging needs within a dynamic and well-established network.

Brentwood charging by the numbers

Locations
31
Chargers
99
DC Fast locations
4
Level 2 locations
27

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 3.2. Average DC fast power: 268 kW.

Brentwood charging — local snapshot

Top operator share
ChargePoint Network runs 74% of public locations across 7 networks.
Average DC fast power
268 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 31 locations
Estimated DC ports
36 fast-charging ports city-wide

Charging networks in Brentwood

The following operators run public charging in Brentwood, ranked by number of locations.

Featured charging locations in Brentwood

A selection of higher-power public charging locations across Brentwood, sorted by power level.

  1. Balfour Plaza — Brentwood, CA, 94513 (eVgo Network · DC Fast · 350 kW)
  2. Raley's — Brentwood, CA, 94513 (eVgo Network · DC Fast · 350 kW)
  3. Streets of Brentwood - Tesla Supercharger — Brentwood, CA, 94513 (Tesla · DC Fast · 250 kW)
  4. Bill Brandt Ford — Brentwood, CA, 94513 (FORD_CHARGE · DC Fast · 120 kW)
  5. Liberty Union High School District — Brentwood, CA, 94513 (Blink Network · Level 2 · 21.6 kW)
  6. Hannah Nicole Vineyards & Winery - Tesla Destination — Brentwood, CA, 94513 (Tesla Destination · Level 2 · 7.2 kW)
  7. Silvergate Apartments — Brentwood, CA, 94513 (EVGATEWAY · Level 2 · 7.2 kW)
  8. Brentwood, CA (Wall Connector) - Tesla Destination — Brentwood, CA, 94513 (Tesla Destination · Level 2 · 7.2 kW)
  9. 4CD BRW STN 7 — Brentwood, CA, 94513 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITYOFBRENTWOOD STATION #2 — Brentwood, CA, 94513 (ChargePoint Network · Level 2 · 6.5 kW)
  11. 4CD BRW STN 11 — Brentwood, CA, 94513 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITYOFBRENTWOOD STATION #7 — Brentwood, CA, 94513 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Brentwood specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Brentwood, California?
There are 31 public electric vehicle charging locations in Brentwood, California, with a combined 99 individual chargers. 4 locations offer DC fast charging and 27 provide Level 2 charging.
What is the largest EV charging network in Brentwood?
ChargePoint Network operates the most public charging locations in Brentwood with 23 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Brentwood?
Level 2 EV chargers in Brentwood typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Brentwood?
Most Brentwood projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Brentwood?
A typical commercial Level 2 installation in Brentwood energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Brentwood take to become profitable?
Payback in Brentwood depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.