Install EV Chargers in Pittsburg, California

Install EV chargers or analyze a site in Pittsburg, California. 18 existing public charging locations (3 DC fast, 15 Level 2). Free 0–100 profitability score on any Pittsburg address from EV Data Map by Charge Rigs.

Pittsburg, California is served by 18 public electric vehicle charging locations operating 44 individual chargers — an average of 2.4 chargers per site. Of those locations, 3 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pittsburg is ChargePoint Network with 15 locations, followed by FLO with 1. Average DC fast power across the city is approximately 253 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pittsburg and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pittsburg

Pittsburg, California, features a solid EV charging infrastructure that heavily leans on ChargePoint Network, which operates 83% of the city's 18 public charging locations. With three DC fast chargers averaging an impressive 253 kW and reaching up to 350 kW, these stations offer some of the fastest charging options available, ideal for drivers seeking quick turnaround. Notably, every DC fast station is rated 150 kW or higher, creating a competitive landscape where new operators focusing on similar power levels can strategically position themselves. While 17% of the charging sites are DC fast, the remainder caters to longer-dwell Level 2 needs, making the charging experience diverse and targeted. This dynamic underscores the importance of analyzing the local footprint to identify market opportunities.

Pittsburg charging by the numbers

Locations
18
Chargers
44
DC Fast locations
3
Level 2 locations
15

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.4. Average DC fast power: 253 kW.

Pittsburg charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 4 networks.
Average DC fast power
253 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 18 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Pittsburg

The following operators run public charging in Pittsburg, ranked by number of locations.

Featured charging locations in Pittsburg

A selection of higher-power public charging locations across Pittsburg, sorted by power level.

  1. BOA CA4-107 (Pittsburg, CA) — Pittsburg, CA, 94565 (Electrify America · DC Fast · 350 kW)
  2. H&S ENERGY PM# CHEVRON3 — Pittsburg, CA, 94565 (ChargePoint Network · DC Fast · 205 kW)
  3. H&S ENERGY PM3 CHEVRON4 — Pittsburg, CA, 94565 (ChargePoint Network · DC Fast · 205 kW)
  4. EdgeWater Apartments — Pittsburg, CA, 94565 (Blink Network · Level 2 · 10.8 kW)
  5. LMC LMC LOT A STN05 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  6. LMC LMC LOT A STN04 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  7. 4CD LMC LOT A STN10 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  8. LMC LMC LOT A STN06 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  9. LMC LMC LOT A STN01 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LMC LMC LOT A STN03 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  11. ADMIN OFFICE STATION 1 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)
  12. LMC LMC LOT A STN07 — Pittsburg, CA, 94565 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pittsburg specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pittsburg, California?
There are 18 public electric vehicle charging locations in Pittsburg, California, with a combined 44 individual chargers. 3 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Pittsburg?
ChargePoint Network operates the most public charging locations in Pittsburg with 15 sites, followed by FLO with 1 sites.
How much does it cost to install an EV charger in Pittsburg?
Level 2 EV chargers in Pittsburg typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pittsburg?
Most Pittsburg projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pittsburg?
A typical commercial Level 2 installation in Pittsburg energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pittsburg take to become profitable?
Payback in Pittsburg depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.