Install EV Chargers in Oakley, California

Install EV chargers or analyze a site in Oakley, California. 15 existing public charging locations (2 DC fast, 13 Level 2). Free 0–100 profitability score on any Oakley address from EV Data Map by Charge Rigs.

Oakley, California is served by 15 public electric vehicle charging locations operating 27 individual chargers — an average of 1.8 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oakley is ChargePoint Network with 13 locations, followed by eVgo Network with 1. Average DC fast power across the city is approximately 265 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oakley and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oakley

In Oakley, California, the public charging landscape is largely shaped by a strong presence of ChargePoint Network, operating 87% of the city’s 15 public charging locations. With a notable average DC fast charging power of 265 kW and all fast chargers exceeding 150 kW, Oakley offers some of the most powerful charging options available, appealing to drivers seeking quick turnaround times. This concentration under a single operator suggests reliability in uptime and pricing, which is crucial for potential developers assessing market competition. Moreover, the 13% share of DC fast chargers alongside 12 Level 2 stations creates a diverse charging ecosystem that caters to both quick-stop and longer-dwell needs, highlighting opportunities for strategic expansion in this growing area.

Oakley charging by the numbers

Locations
15
Chargers
27
DC Fast locations
2
Level 2 locations
13

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 1.8. Average DC fast power: 265 kW.

Oakley charging — local snapshot

Top operator share
ChargePoint Network runs 87% of public locations across 3 networks.
Average DC fast power
265 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 15 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Oakley

The following operators run public charging in Oakley, ranked by number of locations.

Featured charging locations in Oakley

A selection of higher-power public charging locations across Oakley, sorted by power level.

  1. Raley's Oakley #304 — Oakley, CA, 94561 (eVgo Network · DC Fast · 350 kW)
  2. ARCO, Main St, Oakley, CA — Oakley, CA, 94561 (BP_PULSE · DC Fast · 180 kW)
  3. OAKLEY CIVIC C1 CHARGER 8 EAST — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  4. OAKLEY CIVIC C1 CHARGER 10 EAST — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  5. DWD EV STATION 1 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  6. OAKLEY CIVIC C1 CHARGER 9 EAST — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  7. OAKLEY CIVIC C1 OAKLEY CIV EV2 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  8. OAKLEY CIVIC C1 DOWNTOWN 1 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  9. OAKLEY CIVIC C1 DOWNTOWN 4 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OAKLEY CIVIC C1 DOWNTOWN 5 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  11. OAKLEY CIVIC C1 CHARGER 7 EAST — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)
  12. OAKLEY CIVIC C1 DOWNTOWN 3 — Oakley, CA, 94561 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oakley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oakley, California?
There are 15 public electric vehicle charging locations in Oakley, California, with a combined 27 individual chargers. 2 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Oakley?
ChargePoint Network operates the most public charging locations in Oakley with 13 sites, followed by eVgo Network with 1 sites.
How much does it cost to install an EV charger in Oakley?
Level 2 EV chargers in Oakley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oakley?
Most Oakley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oakley?
A typical commercial Level 2 installation in Oakley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oakley take to become profitable?
Payback in Oakley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage